IEC 62591 Wireless Interface Instruction Manual (for ControlWave Micro)
2-4
Installation
Revised October-2019
Note
:
Ensure that wiring between the ControlWave Micro IEC 62591
module and the Field Link meets all appropriate local
requirements (use of conduit, etc.).
2.3.1 Wiring the Field Link
1.
Power down the IEC 62591 module (if it is currently powered).
2.
Remove the housing cover identified on the casing as “Field
Terminals.”
3.
Connect the positive power lead to the “+” power terminal and the
negative power lead to the “–” power terminal.
4.
Connect the data + lead to the “A (+)” terminal and the data – lead
to the “B (–)” terminal (see
Figure 2-4
).
5.
Plug and seal any unused conduit connectors.
6.
Replace the housing cover.
A. Data A (+)
B. Data B (
–
)
C. Return
D. +10.5 to 30 Vdc
Figure 2-4. Field Link Power and Data Wiring
2.3.2 Wiring the IEC 62591 Module
Figure 2-5
provides a wiring diagram for the IEC 62591 module.
You must connect an RS-485 cable between the RS-485 port on the
module, and the Field Link. This requires a Belden 2-twisted pair cable.
Table 2-1
shows connections for the twisted pair cable. You must also
connect termination jumper wires as shown in
Figure 2-6.
A
B
C
D