21
Fixing dimensions and distances - Single fan unit
Fixing dimensions and distances - Dual fan unit
Location and Fixing
The unit should always be installed in a location that ensures clean air flow. It is recommended that a clearance of 300 mm from the wall
(or the next unit) be maintained from the unit’s left and rear panels whereas a clearance of 500 mm must be maintained from the unit’s
right, top and front panels (seen facing the front of the unit). Both service access and airflow have been considered in making these
recommendations. Where multiple units are to be installed in the same location, the contractor needs to consider each individual case
carefully. There can be many variations of unit quantities and available space and it is not the intention of this manual to go over these.
Ideally, the unit should be mounted on a solid concrete slab with anti-vibration pads between unit feet and concrete. However the ZX
condensing unit has also been designed for wall mounting on suitable brackets. Wall mounting brackets are not included. Another factor
to consider in finding a good installation site is the direction of the prevailing wind. For example if the air leaving the condenser faces
the prevailing wind, the air flow through the condenser can be impeded, causing high condensing temperatures ultimately resulting in
reducing unit life. A baffle is a remedy for this situation.