April 2022
Installation, Operation and Maintenance Manual
E-90090007 Rev. 0
12
Section 6: Installation
Installation
Section 6: Installation
6.1
Notes
!
CAUTION
The areas inside the pedestal around the connector are PINCH POINTS for hands
and fingers.
!
CAUTION
Line pressure can cause a valve to open or close unexpectedly. It is recommended for the
installation to be performed on the valve with no pressure in the line.
•
GVO linear operators shipped mounted to valves have their travel adjusted
properly by the manufacturer and do not require further adjustment. Install valve
with GVO linear operator directly in line.
•
If the valve is not shipped with the operator, the valve might need to be prepared
for installation. Any device that would restrict the free movement of the valve
stem or prevent installation of the operator (e.g.; handwheel or stem nut) must be
removed. Consult valve manufacturer for instructions.
•
When connecting to power gas supply, be sure to use internally clean pipe or
tubing, and assure appropriate pressure and flow capacity for the controls.
Clean, dry supply gas will help to ensure trouble-free operation.
•
Before beginning installation check valve and operator for compatibility.
Verify connector thread matches valve stem. Verify operator mounting
plate/valve gear flange connection (e.g., bolt pattern, and alignment bosses).
Verify mounting hardware bolts, studs, lock washers, etc. are the proper amounts,
lengths, and sizes.
•
Ensure threads and mating surfaces are free of dirt and debris.