April 2022
Installation, Operation and Maintenance Manual
E-90090007 Rev. 0
7
Section 5: Preparation
Preparation
Section 5: Preparation
Before beginning to work (installation, operation, or maintenance) on the operator,
please be sure to read through all the applicable sections of the manual to ensure that you
are familiar with the expected sequence of events.
5.1
Tools
Listed are the recommended tools and materials that may be required when working on
the operator. Depending upon specific operator/task, additional tools and materials may
be required.
•
Vernier/measurement ruler
•
A set of SAE combination wrenches and sockets
•
A set of SAE hex keys
•
Strap or pipe wrench (small to medium sizes)
•
Large size ring wrench/hammer wrench
•
Torque wrench with suitable rating
•
Lifting device or a crane, complete with slings, a pair of shackles or clevises
•
Power gas supply rated within specific pressure range in the supplied schematics
•
Hydraulic power unit
•
Block and bleed test valve assembly
•
Anti-seize (lubricant) compound
•
Pipe thread sealant (e.g.; Teflon tape, pipe dope)
•
Commercial solvent (e.g.; Varsol)