FRU Installation
AXP640 Installation and Use (6806800M24E
)
116
7. Fully insert the RTM and lock it to the shelf by pressing the two components of the
lower and the upper handles together and turning the handles toward the face
plate.
8. Tighten both face plate screws on the RTM.
9. Insert the front blade from the system's front into the same slot as the RTM.
As soon as the front blade is connected to the backplane, the blue hot swap LEDs of
both the front blade and the RTM are illuminated permanently. This indicates that
the IPMC of the front blade and the MMC of the RTM are powered up.
10. Close the handles of the front blade.
The blue LEDs on both the front blade and the RTM start flashing. This indicates
that the front blade is informing the shelf manager about its desire to power up the
payload of both the front blade and the RTM.
11. Tighten the two face plate screws on the front blade.
12. Wait until the blue LEDs on both the front blade and the RTM are OFF.
Содержание AXP640-AC2-110VAC
Страница 8: ...AXP640 Installation and Use 6806800M24E Contents 8 Contents Contents ...
Страница 10: ...AXP640 Installation and Use 6806800M24E 10 List of Tables ...
Страница 26: ...Platform Architecture AXP640 Installation and Use 6806800M24E 26 ...
Страница 29: ...AXP640 Shelf Description AXP640 Installation and Use 6806800M24E 29 Figure 2 2 DC Rear Shelf View ...
Страница 45: ...AXP640 Shelf Description AXP640 Installation and Use 6806800M24E 45 Figure 2 13 AC Inlet Markings 110V ...
Страница 46: ...AXP640 Shelf Description AXP640 Installation and Use 6806800M24E 46 Figure 2 14 AC Inlet 220V ...
Страница 50: ...AXP640 Shelf Description AXP640 Installation and Use 6806800M24E 50 Figure 2 16 AC Rating Label ...
Страница 51: ...AXP640 Shelf Description AXP640 Installation and Use 6806800M24E 51 Figure 2 17 DC Rating Label ...
Страница 52: ...AXP640 Shelf Description AXP640 Installation and Use 6806800M24E 52 ...
Страница 64: ...Site Preparation AXP640 Installation and Use 6806800M24E 64 Figure 3 2 ETSI Frame Mount Rear View ...
Страница 65: ...Site Preparation AXP640 Installation and Use 6806800M24E 65 Figure 3 3 ETSI Frame Mount Side View ...
Страница 66: ...Site Preparation AXP640 Installation and Use 6806800M24E 66 Figure 3 4 19 inch Frame Front Mount Front View ...
Страница 67: ...Site Preparation AXP640 Installation and Use 6806800M24E 67 Figure 3 5 19 inch Frame Mid mount Front View ...
Страница 68: ...Site Preparation AXP640 Installation and Use 6806800M24E 68 Figure 3 6 19 23 inch Frame Mid mount Side View ...
Страница 69: ...Site Preparation AXP640 Installation and Use 6806800M24E 69 Figure 3 7 23 inch Frame Front Mount Front View ...
Страница 76: ...Site Preparation AXP640 Installation and Use 6806800M24E 76 ...
Страница 86: ...AXP640 Operations AXP640 Installation and Use 6806800M24E 86 ...
Страница 110: ...AXP640 Shelf Installation AXP640 Installation and Use 6806800M24E 110 ...
Страница 138: ...FRU Installation AXP640 Installation and Use 6806800M24E 138 ...
Страница 189: ......