8
•
Energy Meter Installation and Operation Manual
026-1726 Rev 2
Figure 4-3
- 1-Phase Direct Voltage Connection 2 CT
Figure 4-4
- 3-Phase 3-Wire 3 CT no PT
WARNING! CTs are referenced to the meter’s
neutral (N).
Figure 4-5
- 3-Phase 4-Wire Wye Direct Voltage Input
Connection 3 CT
Figure 4-6
- 3-Phase 4-Wire Wye Connection 3 CT 3 PT
Содержание 250-5000
Страница 1: ...Energy Meter Installation and Operation Manual 026 1726 Rev 2 ...
Страница 2: ......
Страница 4: ......
Страница 27: ...22 Energy Meter Installation and Operation Manual 026 1726 Rev 2 11 Alert Reset Information ...
Страница 29: ...24 Energy Meter Installation and Operation Manual 026 1726 Rev 2 ...
Страница 33: ......