16
the pump will show the “Delay” (pump’s activation delay) as shown fig.2:
Press any key to skip the “Delay”. Pump will show “Srokes” (actual strokes) as shown in fig.3:
In any working mode, if a SEFL is installed and enabled (see SEFL Setup procedure), the display will show the icon (asterisk
as in fig. 4):
- if SEFL works correctly, the asterisk blinks to any pulses given by the solenoid;
- if the asterisk does not appear, there is an anomaly (i.e.: hoses and/or valves are obstructed, SEFL in not connected, etc.).
Press and keep pressed the “RIGHT” key to enter into priming mode. Pump will go for 30 seconds into priming mode as shown
in fig.5.
When the chemical begins to flow out from the outgassing hose then completely close the outgassing knob (except for self-
venting pump heads). This ends the priming procedure. If countdown for priming is not yet ended press
“ESC”
key.
Now the pump is operative. Proceed to setup and programming.
fig.1
fig.2
fig.3
fig.4
PRIMING
To proceed follow these steps: connect all hoses to the pump; open dischage valve by completely turning the discharging knob
(counter clock-wise). Power up the pump and turn stroke lenght knob to 100%. After pump’s intro (fig.1):
*
tMS dc
R: 1.xx
WAITING
00:59
STROKES
100 SPM
STROKES
100 SPM
PRIMING
30 Sec.
fig.5
10. Priming