Cabling the EMC Celerra NS20FC system
SPS B
(optional)
CIP-001090MOD
!
!
!
!!
CS
Blade enclosure
DAE
SPS A
SP A
Blade 2
Power Distribution Panel (PDP)
SP B
A
B
Cable the Celerra NS20FC power cables.
For more information, refer to Celerra Tools on http://Powerlink.EMC.com
Note:
Standby power supply B (SPS B) is optional. If SPS B is used, plug the B-side power supplies on
the storage processor enclosure (SPE) and disk-array enclosure (DAE) into SPS B, and plug SPS B into
the left-side power distribution panel (PDP) on your cabinet.