background image

17

Cabling the EMC Celerra NS20FC system

SPS B

(optional)

CIP-001090MOD

!

!

!

!!

CS

Blade enclosure

DAE

SPS A 

SP A

Blade 2

Power Distribution Panel (PDP)

SP B

A

B

Cable the Celerra NS20FC power cables.

For more information, refer to Celerra Tools on http://Powerlink.EMC.com

Note: 

Standby power supply B (SPS B) is optional.  If SPS B is used, plug the B-side power supplies on 

the storage processor enclosure (SPE) and disk-array enclosure (DAE) into SPS B, and plug SPS B into 
the left-side power distribution panel (PDP) on your cabinet. 

Содержание Celerra NS20FC

Страница 1: ...EMC Celerra NS20FC System Dual Blade with FC Option Enabled Installation Guide P N 300 007 636 Rev A01...

Страница 2: ...icable software license All other trademarks used herein are the property of their respective owners For the most up to date regulatory document for your product line go to the Technical Documentation...

Страница 3: ...Power requirements Rack space requirements Default IP addresses The system components communicate with each other using a private Internet Protocol IP network By default this network uses the IP addr...

Страница 4: ...ti o n P N n n n n n n n n n A 0 n C o p y ri g h t 2 n n n E M C C o rp o ra ti o n A ll R ig h ts R e s e rv e d C C C e le rr a N S 2 0 C e le C e C e l e l C e C C S y s te m T u to ri a l C D C S...

Страница 5: ...About 15 minutes Register your system with the service provider If you do not register your system now using the 4 Celerra Startup Assistant your request for support from EMC Customer Service will be...

Страница 6: ...et 70 in tall where 1 unit 1 75 in start on page 11 of this document and confirm that the cables are installed correctly and securely otherwise start unpacking your Celerra NS20FC system from the disp...

Страница 7: ...cumentation CD Crossover cable Getting Started with Celerra Serial cable Note The shaded areas in the table represent separate containers packages and boxes If additional accessory boxes are necessary...

Страница 8: ...rails in place this may cause damage to the components Only remove one component at a time 3 The rails remain in the mini rack shipping container at this time Front Mini rack Control Station Storage...

Страница 9: ...e rack Allow some adjustment space for the installation of the components Rail slide Rail slide Rail extensions Remove rear screws CNS 000854 Front of your rack Rear of your rack Rail slide Rail slide...

Страница 10: ...Install screws through rack into the rail 1a through 4a Install the bottom component first Ensure that each component is secure before you install the component above it 1a 2a 2b 3a 3b 4a 1 2 3 4 5 C...

Страница 11: ...SP A 2 Fibre SP B 2 Fibre SP A 3 Fibre SP B 3 Fibre Storage processor enclosure Blade enclosure 1 2 3 4 Blade 3 Blade 2 SP B SP A 2 Fibre 3 Fibre BE0 BE1 BE0 2 Fibre 3 Fibre BE1 A B SP A 2 Fibre BE1...

Страница 12: ...22 FC Blade 2 Blade 3 Storage processor enclosure A B SPB SPA CIP 001071 Blade enclosure SPS A SP A SPS A This is the cable for optional standby power supply B SP A SPS B SP B Modem Cable the Celerra...

Страница 13: ...de 3 Blade 3 SP B CS Storage processor enclosure Blade enclosure SP B 1 CS A 2 3 4 SP A B 1 2 3 SP A Blade 2 Blade 2 Blade 3 Blade 3 C S A Blade 3 Blade 2 4 SPB SPA CIP 001077MOD CS B Cable the Celerr...

Страница 14: ...MT 3 To public LAN customer supplied 3 To public LAN To public LAN 1 MGMT Storage processor enclosure Control Station Standby power supply Cable the Celerra NS20FC external LAN cables Note Attach cust...

Страница 15: ...BE0 SP A BE0 Control Station CS Latch side Up LCC B Latch side Down LCC A Pull release tab Pull release tab Storage processor SP B latch up LCC B Storage processor SP A latch down LCC A 2 1 EXP PRI E...

Страница 16: ...osure DAE Standby power supply SPS Control Station CS Blade enclosure Storage processor enclosure SP Disk array enclosure DAE Disk array enclosure DAE B A Cable extra Celerra NS20FC disk array enclosu...

Страница 17: ...the Celerra NS20FC power cables For more information refer to Celerra Tools on http Powerlink EMC com Note Standby power supply B SPS B is optional If SPS B is used plug the B side power supplies on...

Страница 18: ...4Gb EXP PRI 4 5 6 7 0 1 2 3 4 5 6 7 0 1 2 3 EXP PRI EX 4Gb EXP PRI BE0 BE0 SPS A SP A SP A SP B Blade 3 Blade 2 CONTROL STATION MGMT A CS B MGMT CS SP B 2 Fibre Blade 3 BE 0 SP A 3 Fibre SP B BE 0 LC...

Страница 19: ...d default value nasadmin NAS Administrator default value nasadmin Blade DNS domain Blade primary DNS server Blade secondary DNS server Blade NTP server Blade default gateway Storage processor A IP add...

Страница 20: ...mask Initiator IQN or EUI name LUN size GB 7 Record NFS export 8 Record iSCSI LUN 6 Record the licenses that you have purchased Advanced Celerra Manager CIFS Windows NFS UNIX Linux iSCSI SnapSure 9 Re...

Страница 21: ...tant CSA Before installing the CSA verify the following requirements Celerra Network Server Applications and Tools CD is available Windows based client computer is on the same subnet customer network...

Страница 22: ...stant shortcut on the desktop to launch CSA or go to 1 C ProgramFiles EMC CSA startup launch bat to run the Celerra Startup Assistant The Celerra Startup Assistant guides you through the remaining ste...

Страница 23: ...n common usages or you can configure your system using your Celerra Manager Common implementations Create CIFS shares Create iSCSI LUNs Create NFS exports Configure MPFS enabled systems Add additional...

Страница 24: ...24...

Отзывы: