P02 – Pump operation time setting 

 

Shows  current  pump  operating  time, 

  increase  operating  time, 

  decrease  operating  time, 

 

confirm  setting  (10  is  recommended),  ON  parameter  on  display  sets  continuous  pump  operation 
independently of boiler heaters operation status, 

 go to P03 function.

 

P03 – PID controller 

 

Shows  current  PID  setting, 

  increase  coefficient 

  decrease  coefficient, 

  confirm  setting  (3  is 

recommended), 

 go to P04 function. 

Note: if it takes too long for boiler to reach required temperature, 

set coefficient on 4 or 5 and to 1 or 2 if the increase is too fast.

 

 

P04 – Maximum boiler operating temperature - CH 

 

Shows set operating temperature, 

 increase temperature up to 70°C (90°C for AsHZ and ASBIII only), 

 decrease temperature, 

 confirm setting (70 is recommended), 

 go to P05 function. 

 

P05 – Maximum boiler operating temperature – HUW (AsD model only) 

 

Shows  set  operating  temperature, 

  increase  temperature  up  to  65°C, 

  decrease  temperature 

down to 5°C, 

 confirm setting (50 is recommended), 

 go to P06 function. 

 

P06 – Boiler operation hysteresis 

 

Shows current hysteresis setting, 

 increase value 2-6°C 

 decrease value 5-1°C, 

 confirm setting 

(6  is  recommended), 

  go  to  P07  function. 

Note:  1-2-3°C  setting  is  available  with  max  temperature  of 

40°C; 4-5-6°C setting is available with temperatures between 50 and 90°C.

 

 

P07 – Energy consumption in kWh 

(for preset time not exceeding 24h, after 24h counter stops) 

 

Shows  consumption  level  in  kWh, 

  counter  resets,  kWh  consumption  level  is  calculated  with  1 

second updates, 

 go to P08 function. 

 

P08 – Energy consumption in kWh for the last 24 hours

 

LED  display  shows  consumption  level  in  kWh  for  the  last  24h  with  20  minutes  updates, 

  go  to  P09 

function. 

 

Содержание redline asbill

Страница 1: ...ntral heating systems Electric heating boiler SilverLine series RedLine series AsP Wachmistrz Venus Venere AsBN Rotmistrz Earth Terra AsZN Major Mars Marte AsD Brygadier Jupiter Giove AsBI Działon Saturn Saturno AsMB Mobilny Mobile Mobil AsHZ Husarz Comet Cometa AsBIII Batalion Star Stella Please see video prior installation ...

Страница 2: ... BOILERS for more detailed pictures please see www elterm pl Dimensions and components of AsBN boiler Dimensions and components of AsP boiler Dimensions and components of AsD boiler Dimensions and components of AsZN boiler Dimensions and components of AsBI boiler Dimensions and components of AsMB boiler ...

Страница 3: ...g systems safety unit expansion vessel and circulation pump is included AsD boiler in closed central heating system this model is designed for autonomous operation in both open and closed central heating systems safety unit expansion vessel and circulation pumps are included Additional water tank with coil at least 12kW is needed for proper boiler operation 1 External metal cast 2 Mounting plate 3...

Страница 4: ...ase power supply 400V 3N 50Hz Models with 4 6 9 12 and 15kW powers are also available without any processing in 1 phase version 230V 1N 50Hz greater powers can also be prepared in 1 phase version upon request Boiler s power supply is connected to terminal strip labeled as L1L2L3N PE wire needs to be connected to screw on mounting plate Technical data table below provides information on the cross s...

Страница 5: ...e 1 x 80 3 x 10 0 180 250 15 kW 100 67 33 by 1 6 3 phases 3 x 25 5 x 4 0 180 250 18 kW 100 67 33 by 1 6 3 phases 3 x 32 5 x 6 0 220 310 21 kW 100 67 33 by 1 6 3 phases 3 x 40 5 x 6 0 260 360 24 kW 100 67 33 by 1 6 3 phases 3 x 40 5 x 10 0 300 400 27 kW 100 67 33 by 1 6 3 phases 3 x 50 5 x 16 0 220 380 30 kW 100 67 33 by 1 6 3 phases 3 x 50 5 x 16 0 240 400 33 kW 100 67 33 by 1 6 3 phases 3 x 50 5 ...

Страница 6: ...llation if it isn t please turn the boiler off and on again to repeat activity 4 For AsD model only LED display shows number 50 it represents current HUW temperature set on boiler bottom line visible on display Increase required temperature decrease required temperature confirm required temperature go to CH temperature setting 5 LED display shows number 20 it represents current CH temperature set ...

Страница 7: ...y decrease temperature confirm setting 70 is recommended go to P05 function P05 Maximum boiler operating temperature HUW AsD model only Shows set operating temperature increase temperature up to 65 C decrease temperature down to 5 C confirm setting 50 is recommended go to P06 function P06 Boiler operation hysteresis Shows current hysteresis setting increase value 2 6 C decrease value 5 1 C confirm...

Страница 8: ... lower line blinking Do not remove boiler external metal casing once device remains turned on In case boiler is activated by mistake with no water inside wait until heaters cool down fill device with water and switch it on again Under no circumstances fill device with cold water when heaters are still hot Once water in central heating system is heated system should be bled once again special atten...

Страница 9: ...ween boiler and room thermostat Room temperature reached already idle time Wait for room temperature drop verification 5 LED display shows one of the below message E01 sensor error short circuit insufficient resistance e g sensor wire damaged E02 sensor error excessive resistance sensor not connected wire broken terminals not tightened properly on terminal strip Temperature not measured damaged se...

Страница 10: ...requirements concerning Ecodesign for energy related products Attachment 13 EU Commission regulation nr 622 2012 With regard to Ecodesign requirements for glandless standalone circulators and glandless circulators integrated in products and that the standards hereinafter referred to have been duly applied and observed The harmonized standards applicable to the product to which this declaration of ...

Страница 11: ...e or assembly that is not in compliance with the user manual etc or in the event the guarantee is invalid the costs of repair and travelling are borne by the claimant 6 Failure on the part of the user to follow the serviceperson s recommendations provided in the guarantee repair protocol results in the guarantee being suspended until such recommendations are implemented Do not call servicemen with...

Страница 12: ...12 Elterm M M Kaszuba Sp J ul Przemyslowa 5 86 200 Chelmno Our other products For more information please visit www elterm pl ...

Отзывы: