APPLICATION 

All  SilverLine  and  RedLine

  heating  boilers  are  designed  to  provide  heating  to  small  and  medium  sized 

locations equipped with either open or closed low-temperature (T<100°C) central heating water systems. 

AsP

  boiler  in  closed  central  heating  system  –  in  closed  type  layout,  the  central  system  needs  to  be 

equipped  with  a  safety  unit  and  expansion  vessel.  Regardless  of  the  system  type  (open  or  closed),  the 
boiler  needs  to  work  with  circulation  pump.  Safety  unit,  expansion  vessel  and  circulation  pump  are  not 
supplied with this model. 

AsBN, AsBI and AsBIII

 boilers in closed central heating system  - in closed type layout, the central system 

needs to be equipped with an expansion vessel, which is not supplied with above models. 

AsZN,  AsHZ

 

and  AsMB

  boilers  in  closed  central  heating  system  –  those  models  are  designed  for 

autonomous operation in both open and closed central heating systems – safety unit, expansion vessel and 
circulation pump is included. 

AsD 

boiler  in  closed  central  heating  system  –  this  model  is  designed  for  autonomous  operation  in  both 

open  and  closed  central  heating  systems  –  safety  unit,  expansion  vessel  and  circulation  pumps  are 
included. Additional water tank with coil (at least 12kW) is needed for proper boiler operation. 

1. External metal cast 
2. Mounting plate 
3. Automatics mounting bracket 
4. LED display 
5. Control panel 
6. Room thermostat connection strip 
7. Boiler body 
8. Boiler insulation 
9. Heating unit 
10. Automatic air vent 3/8’’ 
11. Terminal strip 
12. Relays 
13. Feed pipe ¾’’ (1’’ in AsBI and AsBIII) 
14. Return pipe ¾’’ (1’’ in AsBI and AsBIII) 
15. Electronic pump for CH 
16. Safety valve 3 bar 
17. Manometer 4 bar 
18. Expansion vessel 8l 
19.  Return pipe ¾’’ for HUW (in AsD only) 
20.  Electronic pump for  HUW (in AsD only) 
21. Switch ignition 
22. Solar air vent 
23. Industrial SSR relays 
24. Metal manometer 4 bar 
25. Power cable with CEE Stecker 32A 
26. Thermometer 

 

27. Strainer 
28. Drain valve 
29. Rubber hose (not included) 
30. Aluminum hand trolley

 

Dimensions and components of 

AsHZ

 boiler

 

Dimensions and components of 

AsBIII

 boiler

 

Содержание redline asbill

Страница 1: ...ntral heating systems Electric heating boiler SilverLine series RedLine series AsP Wachmistrz Venus Venere AsBN Rotmistrz Earth Terra AsZN Major Mars Marte AsD Brygadier Jupiter Giove AsBI Działon Saturn Saturno AsMB Mobilny Mobile Mobil AsHZ Husarz Comet Cometa AsBIII Batalion Star Stella Please see video prior installation ...

Страница 2: ... BOILERS for more detailed pictures please see www elterm pl Dimensions and components of AsBN boiler Dimensions and components of AsP boiler Dimensions and components of AsD boiler Dimensions and components of AsZN boiler Dimensions and components of AsBI boiler Dimensions and components of AsMB boiler ...

Страница 3: ...g systems safety unit expansion vessel and circulation pump is included AsD boiler in closed central heating system this model is designed for autonomous operation in both open and closed central heating systems safety unit expansion vessel and circulation pumps are included Additional water tank with coil at least 12kW is needed for proper boiler operation 1 External metal cast 2 Mounting plate 3...

Страница 4: ...ase power supply 400V 3N 50Hz Models with 4 6 9 12 and 15kW powers are also available without any processing in 1 phase version 230V 1N 50Hz greater powers can also be prepared in 1 phase version upon request Boiler s power supply is connected to terminal strip labeled as L1L2L3N PE wire needs to be connected to screw on mounting plate Technical data table below provides information on the cross s...

Страница 5: ...e 1 x 80 3 x 10 0 180 250 15 kW 100 67 33 by 1 6 3 phases 3 x 25 5 x 4 0 180 250 18 kW 100 67 33 by 1 6 3 phases 3 x 32 5 x 6 0 220 310 21 kW 100 67 33 by 1 6 3 phases 3 x 40 5 x 6 0 260 360 24 kW 100 67 33 by 1 6 3 phases 3 x 40 5 x 10 0 300 400 27 kW 100 67 33 by 1 6 3 phases 3 x 50 5 x 16 0 220 380 30 kW 100 67 33 by 1 6 3 phases 3 x 50 5 x 16 0 240 400 33 kW 100 67 33 by 1 6 3 phases 3 x 50 5 ...

Страница 6: ...llation if it isn t please turn the boiler off and on again to repeat activity 4 For AsD model only LED display shows number 50 it represents current HUW temperature set on boiler bottom line visible on display Increase required temperature decrease required temperature confirm required temperature go to CH temperature setting 5 LED display shows number 20 it represents current CH temperature set ...

Страница 7: ...y decrease temperature confirm setting 70 is recommended go to P05 function P05 Maximum boiler operating temperature HUW AsD model only Shows set operating temperature increase temperature up to 65 C decrease temperature down to 5 C confirm setting 50 is recommended go to P06 function P06 Boiler operation hysteresis Shows current hysteresis setting increase value 2 6 C decrease value 5 1 C confirm...

Страница 8: ... lower line blinking Do not remove boiler external metal casing once device remains turned on In case boiler is activated by mistake with no water inside wait until heaters cool down fill device with water and switch it on again Under no circumstances fill device with cold water when heaters are still hot Once water in central heating system is heated system should be bled once again special atten...

Страница 9: ...ween boiler and room thermostat Room temperature reached already idle time Wait for room temperature drop verification 5 LED display shows one of the below message E01 sensor error short circuit insufficient resistance e g sensor wire damaged E02 sensor error excessive resistance sensor not connected wire broken terminals not tightened properly on terminal strip Temperature not measured damaged se...

Страница 10: ...requirements concerning Ecodesign for energy related products Attachment 13 EU Commission regulation nr 622 2012 With regard to Ecodesign requirements for glandless standalone circulators and glandless circulators integrated in products and that the standards hereinafter referred to have been duly applied and observed The harmonized standards applicable to the product to which this declaration of ...

Страница 11: ...e or assembly that is not in compliance with the user manual etc or in the event the guarantee is invalid the costs of repair and travelling are borne by the claimant 6 Failure on the part of the user to follow the serviceperson s recommendations provided in the guarantee repair protocol results in the guarantee being suspended until such recommendations are implemented Do not call servicemen with...

Страница 12: ...12 Elterm M M Kaszuba Sp J ul Przemyslowa 5 86 200 Chelmno Our other products For more information please visit www elterm pl ...

Отзывы: