background image

USER MANUAL

RM-2L

RM-2M

RM-2S

elminorthamerica.com

Inteli-Mixer RM-2

Содержание Inteli-Mixer RM-2

Страница 1: ...USER MANUAL RM 2L RM 2M RM 2S elminorthamerica com Inteli Mixer RM 2...

Страница 2: ...ms F4 F5 F6 F8 F9 6 Customer programs C1 C2 C3 6 Creating customer programs 6 Introduction 6 Entering programming mode 7 Programming mode 7 Learning to use program steps 8 Spinning 8 Temporary pause 8...

Страница 3: ...speed rev min from 1 to 99 Speed selection step rev min 1 Environmental temperature C from 2 to 50 Relative moisture of the atmosphere at the temp 20 C not more than 80 Power adapter input 110 220 V...

Страница 4: ...on On is on the top of the control block Power supply socket is on the back side of the control block Rack to motor connector is on the right side of the control block Back holder Base platform START...

Страница 5: ...ckwise rotation 1 5 sec Hold in initial point F8 110 clockwise rotation 1 5 sec big amplitude U shaking 110 counter clockwise rotation 1 5 sec Hold in initial point 110 counter clockwise rotation 1 5...

Страница 6: ...cy until operation become stable Combined programs F4 F5 F6 F8 F9 These programs are performing different combina tions of rotation and vortexing Current speed is shown on RPM display and can be chang...

Страница 7: ...s and displays acquire additional functions See figure 2 During programming mode RPM display shows rack rotation angle relatively to initial position See dia gram on fig 4 Program seletion buttons Ste...

Страница 8: ...hile entering long programs it is recommended to enter positioning correction each time we pass 00 vertical position point This can be done by selecting SP function in 00 point F display shows P0 and...

Страница 9: ...tor that corresponds to 270 degrees see Fig 3 2 9 Press enter button 2 10 Pressing clockwise rotation button or coun ter clockwise rotation button set 00 value on RPM indicator F indicator will show...

Страница 10: ...g buttons select operation program see Intelli mixer program overview table Set rotation speed and shaking intensity see using mixing programs Note Operation programs can be selected either during ope...

Страница 11: ...emory is empty Enter a new custom program See creating custom programs Disinfection and cleaning Before you start disinfection or cleaning make sure the power adapter is unplugged It is recommended to...

Страница 12: ...harges are applied to the con sumer For all further questions concerning exploitation and maintenance please Contact manufacturer or product vendor Certificate of approval Inteli Mixer RM 2 ____ N0 __...

Отзывы: