15/28 EL50RT 4PH 250m
6.0 BEAM FREQUENCY CHANGE
- Set Transmitter and Receiver at the same channel.
- Refer to the figures and set the beam channel when two or more units are installed in stacked protection or in
line protection.
- When stacked protection is set up, both the upper and lower sensors should be the same model number
types.
stacked protection
Line protection
Line & 2-stacked protection
7.0 ALIGNMENT AND OPERATION
- Apply power to both Transmitter and Receiver.
- Looking through the view finder, locate the other detector in the center of the sights by adjusting vertically
and horizontally.
- Connect the volt-meter (DC10V) to monitor jack input on Receiver's (+) and (-), then fine turn optical
alignment
- Place attenuation sheet on both transmitter and receiver (lower lens)
- Respectively adjust the optical alignment horizontally & vertically on both transmitter and receiver (upper
side) to obtain the maximum voltage (700mV over) from the monitor jack
View Finder
Horizontal
Adjustment
Horizontal
Adjustment
(rough)
Vertical
Adjustment
(rough)
Содержание EL50RT 4PH 250m
Страница 27: ...27 28 EL50RT 4PH 250m ...