background image

97874C (REV. C - 5/04)

ERO28C*C     ERO28RAC*C

PAGE 3

FIG. 4

INSTALLATION INSTRUCTIONS

16

37

FIG. 5

1.  Install mounting frame.  See mounting frame instructions.

2.  Install remote chiller. Remove front panel of chiller. Slide chiller onto the shelf and position it to the left within the guides on the shelf.

3. Attach solenoid valve assy to the underside of cross member of mounting frame on electric eye unit.  See Figure 9.

4. Make water supply connections. Install a shut-off valve and union connection to building water supply (valve and union not provided).  Turn on the

    water supply and flush the line thoroughly.

5. Make connection between remote chiller and building supply line. Install the strainer on the chiller inlet tube. Install a 3/8" O.D unplated copper water

    line between the valve and the cooler. Remove all burrs from the outside of the water line.  Insert the 3/8" water line into the inlet side of the strainer

    by pushing it in until it reaches a positive stop, approximately 3/4" (19mm). See Figures 2 and 4. 

DO NOT SOLDER TUBES INSERTED INTO THE

    STRAINER AS DAMAGE TO THE O-RINGS MAY RESULT.

6. Make connection between remote chiller and solenoid valve assy.  Install the 1/4" tee (provided) on the chiller outlet tube. Insert end of 1/4" O.D. poly

    tubing (provided) into tee on the chiller and the other end into straight fitting on solenoid valve assy.

7. Hang the upper panel on the mounting frame hanger. Align holes in the panel with holes in the mounting frame. Be sure that panel is engaged with

    hanger at top of frame before releasing it.

8. Install fountains. Remove bottom cover plates on underside of fountains and save the screws. Mount the fountains to the upper panel and the wall

    frame with (4) 5/16" x 3/4" (19mm) long bolts and nuts (provided). Tighten securely.

9. Connect solenoid valve assy and regulator holder in fountain with sensor by inserting 1/4" O.D. poly tubing (provided).  Connect fountain with

    push button to chiller by installing 1/4" O.D. poly tubing (provided).  Insert one end into remaining outlet of the 1/4" tee and the other end into the

    regulator holder on push button fountain.

10. Remove elbow from end of p-trap and attach it to drain tube. Re-attach elbow to p-trap and cut waste tube to required length using plumbing

      hardware and trap as a guide.

11. Connect power cord of sensor to solenoid valve by running it through the back panel and connecting it as shown in Fig. 5. Connectors may be

      connected to either terminal on solenoid valve. Attach ground wire to solenoid valve bracket with green ground screw.

12. Turn on water supply. Release air from tank by interrupting infrared beam; steady stream of water assures all air is removed. The sensor has a 30

      second maximum 

ON

 time. It may be necessary to step away from beam a few times to allow chiller tank to refill. Check for leaks.

13. These products are designed to operate on 20-105 PSIG supply line pressure. If inlet pressure is above 105 PSIG, a pressure regulator must be

      installed in the supply line.  Any damage caused by reason of connecting these products to supply line pressures lower than 20 PSIG or higher than

     105 PSIG is not covered by warranty.

14. Make electrical connections to chiller. See chiller instructions.

15. Check stream height from bubbler. Stream height is factory set at 35 PSI . If supply pressure varies greatly from this, remove item 12 (bottom

      cover plate) or item 30 (push button) and adjust the screw on the regulator (item 8). Clockwise adjustment will raise stream height and counter-

      clockwise will lower stream height. For best adjustment stream height should hit basin approximately 6-1/2" (165mm) from the bubbler.

16. Mount lower panel.  Loosen the (2) #10-24 x 5/8" (16mm) screws at frame bottom lip.  Slide upper tongue of lower panel under lower edge of already

      installed upper panel.  Tighten previously loosened screws securely.

17. Replace bottom cover plate to fountain basin using screws provided. Tighten securely.

CHILLER

OUTLET

CHILLER

INLET

7

19

31

17

8

27

34

22

32

25

28

35

36

24

38

23

26

20

18

( TO BUBBLER) 18

18 (TO BUBBLER)

18

18

All manuals and user guides at all-guides.com

Содержание Soft Sides FLEXI-GUARD ERO28C C Series

Страница 1: ... TO WATER LINES ISACOMMON PROCEDURE THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCURAWAY FROM THE BUILDING THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTOAFOUNTAIN CREATINGAN ELECTROLYSIS WHICH CAUSESA METALLIC TASTE ORAN INCREASE IN THE METAL CONTENT OF THE WATER THIS CONDITION ISAVOIDABLE BY USING THE PROPER MATERIALSAS INDICATED ANY DRAIN FITTINGS PROVIDED BY THE INSTALLER SHOULD BE MADE OF...

Страница 2: ...C PAGE 2 FIG 3 LEGEND A 1 4 O D TUBE CONNECT CHILLER WATER OUTLET B 3 8 O D TUBE CONNECT CHILLER WATER INLET SHUT OFF VALVE BY OTHERS C 1 1 4 TRAP FURNISHED D ELECTRICAL INLET ERO28C ERO28RAC All manuals and user guides at all guides com ...

Страница 3: ...g 1 4 O D poly tubing provided Insert one end into remaining outlet of the 1 4 tee and the other end into the regulator holder on push button fountain 10 Remove elbow from end of p trap and attach it to drain tube Re attach elbow to p trap and cut waste tube to required length using plumbing hardware and trap as a guide 11 Connect power cord of sensor to solenoid valve by running it through the ba...

Страница 4: ...file or cut orifice materials 2 Stream Regulator If orifice is free of material deposits regulate water flow according to instructions on page 3 3 Sensor Control The sensor has a 2 second delay time If sensor fails to operate valve mechanism or operates erratically check the following a Ensure there are no obstructions within a 40 inch radius from the front of fountain b Check wire connections at ...

Отзывы: