background image

Rev. 090618

 

7

 

ELITESCREENS.com

 

4. Loosen and remove the 

ropes (G)

 and 

knob screws (I)

 from each leg.  

 

5. Fully tighten the knob at the bottom of the 

center support leg (B). 

Remove the leg, fold and place it 

inside the 

carrying bag (F)

 provided. 

 

 

 

 

 

 

6. Remove the 

folding legs (B)

. Fold and place them inside the 

carrying bag (F)

 provided.  

 

 

 

 

 

 

 

 

 

 

 

7. Detach the 

screen material (D) 

from the

 folding frame (A) 

by carefully pulling and lifting the edges to 

unhook the material from the pegs.  

8. Fold 

screen material (D) 

in half, folding the bottom of the screen towards the top. Then, fold in half 

again in the same way. Lastly, fold the material into thirds to condense the length  and place it into the 

screen material bag (E). 

*If you prefer to roll the material, instead of folding into thirds, roll from one end to the other after 

folding in half twice.  

 

 

 

 

9. Unlatch the hinged support bars in each corner of the 

folding frame (A). 

 

This step is for 180" models only.

 

Содержание Yard Master Pro B Series

Страница 1: ...note of the points below to prevent that from occurring 1 Do not touch the projection surface with your hands 2 Do not write or draw on the projection surface 3 Do not use fingers or sharp objects to...

Страница 2: ...0 models only Note The parts list above is subject to change without notice Correct usage of the projection screen will ensure better viewing results For front projection assemble and view the screen...

Страница 3: ...and pulling the left and right sides outwards Note When unfolding the frame and legs be sure the latches on the hinges click into place Please also make sure all 4 corners of the frame are at a 90 ang...

Страница 4: ...ease follow this order shown in the diagram below 1 2 3 Leg Attachment 4 Carefully take the left and right folding legs B out of the carrying bag F and place it on a flat surface Unfold the left and r...

Страница 5: ...oles on the frame and legs and fasten the knob screws I to all sections excluding the back sections of the folding legs B These are to be secure in later steps See below 9 Attach the ropes and rings G...

Страница 6: ...e the 4 ropes G to the stakes H to prevent the screen from tilting or falling over Your screen should look like figure shown right Screen Disassembly 1 Remove ropes G and stakes H from the ground 2 At...

Страница 7: ...folding frame A by carefully pulling and lifting the edges to unhook the material from the pegs 8 Fold screen material D in half folding the bottom of the screen towards the top Then fold in half agai...

Страница 8: ...frame 11 Store the screen in the provided carrying bag F Be sure to place folding frame legs and smaller parts into the carrying bag first and place the material on top to keep material from creasing...

Отзывы: