background image

5. 

Insert 4 bolts into the bolt channel of each vertical glazing bar. The last bolt will now be used 

 

to attach the glazing bar to the pre fabricated hole in the roof corner bar. 

 
6. 

Attach the main door track support (shaped like a letter 

 

‘Z’ to be found with the door panels) to the top             

 

unoccupied bolt inserted above. 

(Key point).  

This ‘Z’ 

 

shaped bar must be fitted with the two outside slots facing 

 

upwards (as illustrated) 

not

 downwards. Slide the main 

 

door track support as high up the glazing bar as possible 

 

and tighten.

 (Key point).

 

 

7. 

The two shorter horizontal braces attach to the 

top bolt 

in 

 

the gusset plate and the vertical glazing bars using the pre 

 

inserted bolt. 

 
8. 

The longer horizontal braces now attached to the side corner bar (same bolt hole as the       

 

diagonal brace) and the last unoccupied bolt in the glazing bar. 

 
9. 

Stand the frame up and bolt the door track to the main door track support by inserting 3 bolts 

 

into the bolt slot of the door track. Position 3 of these through the 3 holes in the door track 

 

support above the door opening. 

 
10.  Insert 2 extra bolts into each end of the door track which will be used later during general   
 

assembly. 

 

11.  When this has been achieved tighten all nuts. 

 

12.  Slide a bolt into the bolt slot in the built in base section, one at each end. Attach the corner 
 

bracket/angle base leg so that it is pointing downwards. If you are fitting your greenhouse on

 

to soft ground, then do not fit the corner bracket yet. If you are on a patio, you will need to 

 

cut the bracket off level with the bottom of the built in base and slide extra bolts into the bolt 

 

channel to be attached to the anchor bracket (generally 1 every 2’). If you are on soil, the 

 

bracket will go into the ground at general assembly. 

 
 

N.B.  

Please note carefully the correct position of the main door support. The slotted holes at either 

end are facing skywards 

NOT

 downwards. 

(Key point).

 

 
Please note, you only require approx. 40mm of beading in the inside ‘v’ groove of the end glazing 
bars. 

 

 
 
 

Содержание WIDE MAXIM

Страница 1: ......

Страница 2: ......

Страница 3: ......

Страница 4: ...te taped 2 2 2 2 22 Bottom door panel together and marked 2 2 2 2 23 Middle door panel door 6 6 6 6 24 Door track support 1 1 1 1 25 Door posts 2 handed 2 unhanded 4 4 4 4 26 Side glazing bar 2 4 6 8...

Страница 5: ...erable locations such as under trees playing areas etc Children should not play near glass greenhouses REMEMBER glass is fragile handle with care Protective eye glasses should be worn Gloves should be...

Страница 6: ...Bag of fittings containing a Nuts and bolts general assembly b Overlap clips for glass c Spring clips for glass d Casement stay e Casement stay nuts and bolts f Four eave plates not in the main bag bu...

Страница 7: ...be tight enough to stop the bolts slipping out of the glazing bar 5 Fix the built in base cill to the middle glazing bar by pushing the bolt through the hole in the cill unit and tightening as before...

Страница 8: ...SIDE FRAME ASSEMBLY BEWARE OF SHARP EDGES...

Страница 9: ...the outside which indicate that they meet at the ridge and are also mitred at both ends If you have a painted greenhouse there is no letter R on the corner bar You must ensure that the middle hole is...

Страница 10: ...ave 3 grooves to receive beading Do not use the middle one only the two outer grooves require beading 3 Slide two bolts into the bolt channel of each corner bar put a nut on and finger tip tighten app...

Страница 11: ...s and that the glazing bars are right into the angle cill at the bottom Key point 9 Tighten all nuts 10 Slide two extra bolts into the built in base cill This will be used later to attach the angle ba...

Страница 12: ...of the door opening and 1 door end cill 2 Now engage the door end cill with the 2 built in base cills by pushing the angle of the cill under the locator as shown in the diagram At this stage the cill...

Страница 13: ...upport by inserting 3 bolts into the bolt slot of the door track Position 3 of these through the 3 holes in the door track support above the door opening 10 Insert 2 extra bolts into each end of the d...

Страница 14: ...DOOR END ASSEMBLY...

Страница 15: ...el has the edge for the door skids to fit on The lower infill panel locks on to the bottom panel 5 Fix the door together by screwing through the door side pieces into the holes provided in the edge of...

Страница 16: ...unhanded one 11 Do not fit the doors to the gable at this stage wait until the structure is fully assembled prior to glazing 12 Having assembled both doors you need to attach a piece of alloy angle t...

Страница 17: ...ttom rail uppermost The top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge uppermost 3 Slide the glazing beading into the slot in the side and top rails...

Страница 18: ...ASSEMBLY OF GREENHOUSE UNIT...

Страница 19: ...will slide down into the slotted hole at the end of the built in base cill Likewise with the angle base leg this can now be attached to the end built in base cill utilising the bolts inserted at frame...

Страница 20: ...Before sliding the vent into the ridge slide a piece of black tube into the vent hinge socket Slide the vent into posi tion insert a small self tapping screw into the tube approximately way along the...

Страница 21: ...bove the gutter and be running parallel with the roof glazing bars Each corner must be the same If one corner is out the corner di agonally opposite will also be out By carefully pushing and pulling e...

Страница 22: ...the door track This attachment will support the weight of the doors when they are in the open position Attach two small angles 1 x 1 to the ends of the top door track these will act as stops when ope...

Страница 23: ...ap of approx 20mm 3 Hook one overlap clip on the middle of the pane of glass Key point 4 Offer the top pane of glass to the glazing bars resting it on the two clips of the bottom pane Insert two wire...

Страница 24: ...pane You must ensure that you fit glass above and below the louvre The louvre can not sit directly on the bottom aluminium cill Key point Ref Width mm Length mm A 610 610 B 610 457 D 610 210 E 610 30...

Страница 25: ...you do not use muntins or spacers if you have multi sheet or small pane tough ened glass See the diagram for the position of the different sizes The glass is clipped onto the frame in the same way as...

Страница 26: ...elow the louvre The louvre cannot fit onto the bottom aluminium cill Key point Replace pane 54 with 1 piece 610 x 280 the louvre and then 1 pane 610 x 904mm YOUR GREENHOUSE IS NOW COMPLETE Code Width...

Страница 27: ...OPTIONAL EXTRAS Rainwater kits for guttering...

Страница 28: ...ELITE 1206...

Отзывы: