5.
Insert 4 bolts into the bolt channel of each vertical glazing bar. The last bolt will now be used
to attach the glazing bar to the pre fabricated hole in the roof corner bar.
6.
Attach the main door track support (shaped like a letter
‘Z’ to be found with the door panels) to the top
unoccupied bolt inserted above.
(Key point).
This ‘Z’
shaped bar must be fitted with the two outside slots facing
upwards (as illustrated)
not
downwards. Slide the main
door track support as high up the glazing bar as possible
and tighten.
(Key point).
7.
The two shorter horizontal braces attach to the
top bolt
in
the gusset plate and the vertical glazing bars using the pre
inserted bolt.
8.
The longer horizontal braces now attached to the side corner bar (same bolt hole as the
diagonal brace) and the last unoccupied bolt in the glazing bar.
9.
Stand the frame up and bolt the door track to the main door track support by inserting 3 bolts
into the bolt slot of the door track. Position 3 of these through the 3 holes in the door track
support above the door opening.
10. Insert 2 extra bolts into each end of the door track which will be used later during general
assembly.
11. When this has been achieved tighten all nuts.
12. Slide a bolt into the bolt slot in the built in base section, one at each end. Attach the corner
bracket/angle base leg so that it is pointing downwards. If you are fitting your greenhouse on
to soft ground, then do not fit the corner bracket yet. If you are on a patio, you will need to
cut the bracket off level with the bottom of the built in base and slide extra bolts into the bolt
channel to be attached to the anchor bracket (generally 1 every 2’). If you are on soil, the
bracket will go into the ground at general assembly.
N.B.
Please note carefully the correct position of the main door support. The slotted holes at either
end are facing skywards
NOT
downwards.
(Key point).
Please note, you only require approx. 40mm of beading in the inside ‘v’ groove of the end glazing
bars.
Содержание WIDE MAXIM
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 8: ...SIDE FRAME ASSEMBLY BEWARE OF SHARP EDGES...
Страница 14: ...DOOR END ASSEMBLY...
Страница 18: ...ASSEMBLY OF GREENHOUSE UNIT...
Страница 27: ...OPTIONAL EXTRAS Rainwater kits for guttering...
Страница 28: ...ELITE 1206...