Having slid the vents from the end on the ridge to the desired position, you can now fit the “slam
bars” to the 2 glazing bars. Utilise the bolts you inserted during general assembly and position the
“slam bars” just under the vent allowing the casement stay to effectively close. The slam bar can be
adjusted later to facilitate good opening and closing of the vent.
13. Do not fit the doors at this stage.
14. The greenhouse is now ready for lifting on to its permanent base.
15. If you are fitting the greenhouse onto soft ground, you now need to dig 1 hole (approx. 1
spade width) in each of the 4 corners.
16. Lift the greenhouse into position. For soft ground fixing, you now need to attach the corner
bracket/angle base leg to the bolt slot of the side and end using the end of the bracket that has 2
holes as opposed to 4. The bracket must be attached in such a way that the end with 4 holes is point-
ing down into the hole previously made.
N.B.
If you are on soft standing you will need to have something solid underneath the door end
opening, e.g. flag stone, row of bricks or similar. (See page 22 paragraph 3 re fitting the ramp.)
SQUARING UP
You must make sure that the structure is level and square. Put one pane of glass in each corner of
roof, each pane must be level with the small glass retaining lip just above the gutter and be running
parallel with the roof glazing bars. Each corner must be the same. If one corner is out the corner di-
agonally opposite will also be out. By carefully pushing and pulling each corner diagonally you will
be able to see the frame move in and out of square with the glass.
HARD STANDING
Having established the square of the greenhouse, drill the patio or concrete in the required positions,
fit plastic plugs and screw the brackets (attached during subassembly) firmly to the ground using
35mm x 8mm round head screws.
SOIL FLOOR
Determine the square of the greenhouse as described above, make a mix of concrete and put a cou-
ple of shovelfuls around the base of each base leg. When the concrete has gone off back fill with the
soil excavated earlier on. Do not concrete the corners until you are certain the structure is LEVEL &
SQUARE.
FITTING THE DOORS TO THE STRUCTURE
The doors slide onto the frame form opposite sides of the door tracks. For the left hand door put the
door bottom rail into the bottom door track and slide to the right, feed the first wheel into the top
door track and move further to the right until the black draught excluder butts up to the end glazing
bars. Carefully ease the door past the glazing bar and feed in the second wheel. Repeat the process
for the right hand door. (Ensure handed door posts meet in the middle). It may help in the fitting of
the doors to remove the angle on the back of one of the doors and refit it once the doors are on. The
doors.
Содержание WIDE MAXIM
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 8: ...SIDE FRAME ASSEMBLY BEWARE OF SHARP EDGES...
Страница 14: ...DOOR END ASSEMBLY...
Страница 18: ...ASSEMBLY OF GREENHOUSE UNIT...
Страница 27: ...OPTIONAL EXTRAS Rainwater kits for guttering...
Страница 28: ...ELITE 1206...