background image

Having slid the vents from the end on the ridge to the desired position, you can now fit the “slam 
bars” to the 2 glazing bars.  Utilise the bolts you inserted during general assembly and position the 
“slam bars” just under the vent allowing the casement stay to effectively close.  The slam bar can be 
adjusted later to facilitate good opening and closing of the vent. 
 
13.  Do not fit the doors at this stage. 
 
14.  The greenhouse is now ready for lifting on to its permanent base. 
 
15.  If you are fitting the greenhouse onto soft ground, you now need to dig 1 hole (approx. 1 
spade width) in each of the 4 corners.  
 
16.  Lift the greenhouse into position. For soft ground fixing, you now need to attach the corner 
bracket/angle base leg to the bolt slot of the side and end using the end of the bracket that has 2 
holes as opposed to 4. The bracket must be attached in such a way that the end with 4 holes is point-
ing down into the hole previously made. 
 

N.B. 

If you are on soft standing you will need to have something solid underneath the door end 

opening, e.g. flag stone, row of bricks or similar. (See page 22 paragraph 3 re fitting the ramp.) 
 

SQUARING UP 

 
You must make sure that the structure is level and square. Put one pane of glass in each corner of 
roof, each pane must be level with the small glass retaining lip just above the gutter and be running 
parallel with the roof glazing bars. Each corner must be the same. If one corner is out the corner di-
agonally opposite will also be out. By carefully pushing and pulling each corner diagonally you will 
be able to see the frame move in and out of square with the glass.   
 

HARD STANDING 

 
Having established the square of the greenhouse, drill the patio or concrete in the required positions, 
fit plastic plugs and screw the brackets (attached during subassembly) firmly to the ground using 
35mm x 8mm round head screws. 
 

SOIL FLOOR 

 
Determine the square of the greenhouse as described above, make a mix of concrete and put a cou-
ple of shovelfuls around the base of each base leg. When the concrete has gone off back fill with the 
soil excavated earlier on. Do not concrete the corners until you are certain the structure is LEVEL & 
SQUARE. 
 

FITTING THE DOORS TO THE STRUCTURE 

 
The doors slide onto the frame form opposite sides of the door tracks. For the left hand door put the 
door bottom rail into the bottom door track and slide to the right, feed the first wheel into the top 
door track and move further to the right until the black draught excluder butts up to the end glazing 
bars. Carefully ease the door past the glazing bar and feed in the second wheel. Repeat the process 
for the right hand door. (Ensure handed door posts meet in the middle). It may help in the fitting of 
the doors to remove the angle on the back of one of the doors and refit it once the doors are on. The 
doors.  

Содержание WIDE MAXIM

Страница 1: ......

Страница 2: ......

Страница 3: ......

Страница 4: ...te taped 2 2 2 2 22 Bottom door panel together and marked 2 2 2 2 23 Middle door panel door 6 6 6 6 24 Door track support 1 1 1 1 25 Door posts 2 handed 2 unhanded 4 4 4 4 26 Side glazing bar 2 4 6 8...

Страница 5: ...erable locations such as under trees playing areas etc Children should not play near glass greenhouses REMEMBER glass is fragile handle with care Protective eye glasses should be worn Gloves should be...

Страница 6: ...Bag of fittings containing a Nuts and bolts general assembly b Overlap clips for glass c Spring clips for glass d Casement stay e Casement stay nuts and bolts f Four eave plates not in the main bag bu...

Страница 7: ...be tight enough to stop the bolts slipping out of the glazing bar 5 Fix the built in base cill to the middle glazing bar by pushing the bolt through the hole in the cill unit and tightening as before...

Страница 8: ...SIDE FRAME ASSEMBLY BEWARE OF SHARP EDGES...

Страница 9: ...the outside which indicate that they meet at the ridge and are also mitred at both ends If you have a painted greenhouse there is no letter R on the corner bar You must ensure that the middle hole is...

Страница 10: ...ave 3 grooves to receive beading Do not use the middle one only the two outer grooves require beading 3 Slide two bolts into the bolt channel of each corner bar put a nut on and finger tip tighten app...

Страница 11: ...s and that the glazing bars are right into the angle cill at the bottom Key point 9 Tighten all nuts 10 Slide two extra bolts into the built in base cill This will be used later to attach the angle ba...

Страница 12: ...of the door opening and 1 door end cill 2 Now engage the door end cill with the 2 built in base cills by pushing the angle of the cill under the locator as shown in the diagram At this stage the cill...

Страница 13: ...upport by inserting 3 bolts into the bolt slot of the door track Position 3 of these through the 3 holes in the door track support above the door opening 10 Insert 2 extra bolts into each end of the d...

Страница 14: ...DOOR END ASSEMBLY...

Страница 15: ...el has the edge for the door skids to fit on The lower infill panel locks on to the bottom panel 5 Fix the door together by screwing through the door side pieces into the holes provided in the edge of...

Страница 16: ...unhanded one 11 Do not fit the doors to the gable at this stage wait until the structure is fully assembled prior to glazing 12 Having assembled both doors you need to attach a piece of alloy angle t...

Страница 17: ...ttom rail uppermost The top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge uppermost 3 Slide the glazing beading into the slot in the side and top rails...

Страница 18: ...ASSEMBLY OF GREENHOUSE UNIT...

Страница 19: ...will slide down into the slotted hole at the end of the built in base cill Likewise with the angle base leg this can now be attached to the end built in base cill utilising the bolts inserted at frame...

Страница 20: ...Before sliding the vent into the ridge slide a piece of black tube into the vent hinge socket Slide the vent into posi tion insert a small self tapping screw into the tube approximately way along the...

Страница 21: ...bove the gutter and be running parallel with the roof glazing bars Each corner must be the same If one corner is out the corner di agonally opposite will also be out By carefully pushing and pulling e...

Страница 22: ...the door track This attachment will support the weight of the doors when they are in the open position Attach two small angles 1 x 1 to the ends of the top door track these will act as stops when ope...

Страница 23: ...ap of approx 20mm 3 Hook one overlap clip on the middle of the pane of glass Key point 4 Offer the top pane of glass to the glazing bars resting it on the two clips of the bottom pane Insert two wire...

Страница 24: ...pane You must ensure that you fit glass above and below the louvre The louvre can not sit directly on the bottom aluminium cill Key point Ref Width mm Length mm A 610 610 B 610 457 D 610 210 E 610 30...

Страница 25: ...you do not use muntins or spacers if you have multi sheet or small pane tough ened glass See the diagram for the position of the different sizes The glass is clipped onto the frame in the same way as...

Страница 26: ...elow the louvre The louvre cannot fit onto the bottom aluminium cill Key point Replace pane 54 with 1 piece 610 x 280 the louvre and then 1 pane 610 x 904mm YOUR GREENHOUSE IS NOW COMPLETE Code Width...

Страница 27: ...OPTIONAL EXTRAS Rainwater kits for guttering...

Страница 28: ...ELITE 1206...

Отзывы: