8
Installation
Installation - Ducting version
• Install the integral blower spring clip (for integral blower
installation only):
Insert the spring clip from the top outside of the hood
and fix it with 2 screws.
Note:
Insert the spring clip on the slot located close to
the integral blower fixing nut.
• Install
transition
onto top of hood:
Important: remove shipping tape from damper and
check that damper moves freely.
Place the transition over the exhaust hole of the hood
and secure with 4 screws.
Tape to seal connection and check that damper moves
freely.
• Cut a hole in the bottom of the cabinet in order to settle
the hood.
IMPORTANT- Cabinet must be capable of supporting
100 lbs.
• Adjust the position of the clasping side spring by means
of the proper screw, according to the thickness of the
panel to which it is going to be anchored.
• Insert the hood in the cabinet and lock it by means of the
side spring.
WARNING:
2 people are required to lift and position the
hood onto the mounting screws.
• Use the holes in the casing of the hood to attach it using
8 mounting screws.
Содержание LI3FBA Stratus
Страница 6: ...6 Dimensions and Clearances...
Страница 19: ...19 Dimensions et D gagement...
Страница 33: ...33 Dimensiones y Espacios libres...
Страница 43: ......
Страница 44: ...Printed in Mexico LI3FBA Ed 04 08...