2
1. INTRODUCTION
3
2. SAFETY
3
3. DETERMINATION OF THE RAIL AND TAPE LENGTH
4
3.1 Complete assembled guide rail
4
3.2 Guide rail and Magnetic tape - Self assembling
4
5. THE AZ16I IN OPERATION
5
5.1 Initial operation
5
5.1.1 Detection of measuring direction
5
5.1.2 Referencing
5
5.3 Parameter settings
7
6. BATTERY CHANGE
9
7. MAGNETIC TAPE
10
Handling
10
Processing note for sticking
11
Resistance to chemicals of the magnetic tape
11
Sticking and cutting
11
7. TECHNICAL SPECIFICATIONS
(PRELIMINARY)
12
9. TYPE DESIGNATION
13
10. LIABILITY EXCLUSION / GUARANTEE
14