![Elgar Sorensen DCS 3kW Series Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/elgar/sorensen-dcs-3kw-series/sorensen-dcs-3kw-series_operation-manual_2388459008.webp)
Sorensen DCS Series 3kW Supplies
Contents
Remote Programming: Output Voltage and Current Limit ................................. 4-6
Programming Output Voltage .............................................................. 4-9
Programming Output Current Limit .................................................... 4-11
Using Over Voltage Protection (OVP) ........................................................... 4-13
Front Panel OVP Operation ............................................................... 4-13
Resetting the OVP Circuit .................................................................. 4-13
Programming OVP with an External Voltage Source......................... 4-14
STANDBY Switch .............................................................................. 4-15
Programming the Shutdown Function................................................ 4-15
Shutdown Application - Contact Closure ........................................... 4-18
Remote Monitoring of Readback Signals and Status Indicators................... 4-20
Readback Signals .............................................................................. 4-20
Configuring Multiple Supplies for Series Operation ........................... 4-21
Configuring Multiple Supplies for Parallel Operation ......................... 4-22
Configuring Multiple Supplies for Split Supply Operation .................. 4-23
SECTION 5 THEORY OF OPERATION ................................................5-1
AC Input and RFI Filter (A5 PCB) ........................................................ 5-2
AC Input Rectifier and Inrush Limiting Circuit (A6 PCB) ...................... 5-2
PWM, Sync and Power Transformer Drive Circuit (A3 PCB)............... 5-2
Operation Manual
v