Contents
Sorensen DCS Series 3kW Supplies
AC Input Power Requirements .............................................................2-4
AC Input Connector Assembly .............................................................2-5
Strain Relief Assembly .........................................................................2-6
Power-on Check...................................................................................2-8
Voltage Mode Operation Check ...........................................................2-8
Current Mode Operation Check ...........................................................2-9
Front Panel Function Checks ...............................................................2-9
Making the Connections.....................................................................2-11
Connecting Single Loads ...................................................................2-12
Connecting Multiple Loads .................................................................2-12
SECTION 3 BASIC OPERATION ........................................................ 3-1
Operating Modes and Automatic Crossover ........................................3-1
Local Programming Mode Operation ...................................................3-3
Connecting Remote Sense Lines.........................................................3-4
SECTION 4 ADVANCED OPERATION ................................................ 4-1
Configuring for Remote Programming, Sensing, and Monitoring....................4-2
Programming, Monitoring, and Control Functions ................................4-2
Locating Jumpers, Switch, and Connector...........................................4-4
Resetting Jumpers and Switch.............................................................4-5
Making J3 Connections ........................................................................4-6
iv
Operation Manual