INSTALLATION GUIDE FOR EUREKA CISTERN TANK

Multi connector installation.

Your  Cistern  (1)  has  a  threaded  fl ange  (2).  Screw  on  the  multi-
connector  (3)  with  a  1/2”  or  3/4”  outlet.  Use  the  one  that 

corresponds to the diameter of your distribution pipe (5). To tighten 

use  only  your  hands.  Turn  until  the  threaded  plug  of  the  air  jug 

(4) is facing upwards and the cleaning plug (6) is on one side as 

shown in the fi gure. Remove the plug and insert the air jug tube (4).

Connect the Multiconnector (3) to the distribution pipe (5).

Step 3

1

2

3

4

5

6

2. With electronivel (electrode not included). Your new Cistern has 

a  special  base  that  allows  the  placement  of  an  electric  fl oat  or 

electronivel.

Place Tefl on tape (not included) on all pipe threads and fi ttings to 

be installed. 

For the correct installation of the Cistern at fl oor level, the following 

diagram should be considered. 

1. Control alternatives (1 and 2) valve and fl oat.
To install the valve and fl oat your Cistern has a hole (3) in the upper 

neck to insert the water supply pipe (5), at the end of the pipe, using a 

union (4) (not included). Install the valve and fl oat (1 and 2) as shown.

Step 2

2

3

4 5

1

Build a fl at level base to place your cistern.

To obtain adequate pressure in the distribution line, verify that from 
the base of your cistern to the highest expected height (faucet or 
shower), there is a minimum height of 2 meters as shown.

Step 1

2 m

Male adapters

 

 

1/2”

Float

Filter

Multi connector

Tee PVC 1/2”

Valve

 Check

PVC elbolw 1/2”

Shut-off

valve

Water inlet and

outlet

Outlet pipe

support

PVC elbow1/2”

Connecting

flange

Air jug

Shut-off valve 

Electric

 panel

Power supply 

to the building

Foat

Filter

Multi connector

Outlet pipe

 support

Connecting 

flange

Air jug

Level flat base

Filling level

Water inlet 

Outlet pipe

Check valve

Pump

Tank 

Hydropneumatic

Pressure 

switch 

Note: This condition is handled upon request. The accessories of 
the overhead tank condition will be included: multi-connector, 

fl oat valve and air jug. Other accessories and the pumping system 

indicated in the diagram are not included.

Installation instructions 

INSTALLATION OF CISTERN AT GROUND LEVEL

Содержание Plycem Eureka Cistern Tank

Страница 1: ...IMPACT RESISTANT LIGHTWEIGHT HERMETIC HYGIENIC DURABLE EASY TO INSTALL ECO FRIENDLY EASY TO CLEAN Installation guide EUREKA CISTERN TANK ...

Страница 2: ...d fast to install avoiding the high costs of masonry that a traditional tank requires Uniqueinthemarketwith100yearsofwarranty morethanalifetime Capacity liters OA mm C mm D mm 1 200 2 800 5 000 1 070 1 620 2 170 1 680 1 735 1 815 1 370 1 360 1 360 I mm 310 375 455 J mm 215 275 360 These values are indicative and may have a variation of 5 Weight Kg 30 60 110 Store tanks on a flat surface free of ob...

Страница 3: ...ures Installationinstructions 25 cm 25 cm According to poten of expansion 90 25 cm 25 cm 25 cm According to potential of expansion According to of expa 90 25 cm 60 a 75 25 c Hardorrockyland It is all that where excavation is very difficult due to the consistency of the ground It is made up of rocks in very compacted layers In this case the instability is practically null Mediumresistancesoil It is a...

Страница 4: ...on If so 20 cm layers will be placed and compacted with manual equipment It is important to fill the cistern with water to prevent the cistern from deforming under the weight of the material and to facilitate the com paction Step4 The depth of the excavation will be the height of the tank to be installed plus 20 cm considering the thickness of the concrete slab Concrete slab or flat slab Reinforce...

Страница 5: ...ent and water for the stabilization will be done gradually until its complete incorporation and will be left to rest for 48 hours after which the backfilling will proceed as indicated above At this point all the necessary connections will be made by perforating the neck or reinforcements of the At this point all the necessary connections will be made by perforating the neck or reinforcements of th...

Страница 6: ...valve and float your Cistern has a hole 3 in the upper necktoinsertthewatersupplypipe 5 attheendofthepipe usinga union 4 not included Install the valve and float 1 and 2 as shown Step2 2 3 4 5 1 Build a flat level base to place your cistern To obtain adequate pressure in the distribution line verify that from the base of your cistern to the highest expected height faucet or shower there is a minim...

Страница 7: ...ts and rinse 2 3 Do a final cleaning of the inside walls and bottom with a clean dry rag or mop 4 5 Install the discharge plug on the manifold and open the valve that supplies water to your home 6 7 Turn on the water supply to your Cistern wait for it to fill and it is ready to use 5 6 7 8 Cisterns should be washed before installation The tank should always be cleaned every six months Check the fi...

Страница 8: ...RicaS A INTE ISO 14001 2015 SGA 008 01 2010 SISTEMA DE GESTIÓN AMBIENTAL CERTIFICADO 001 CP 2001 PRODUCTO CERTIFICADO 069 CP 2013 PRODUCTO CERTIFICADO INTE ISO 45001 2018 SST 009 2020 SISTEMA DE GESTIÓN DE LA SEGURIDAD Y SALUD EN EL TRABAJO CERTIFICADO INTE ISO 45001 2018 SST 006 2020 SISTEMA DE GESTIÓN DE LA SEGURIDAD Y SALUD EN EL TRABAJO CERTIFICADO Manufacturedby ...

Отзывы: