background image

ELEKTROGAS – MANUALE TECNICO 

 10-12 

 

 

 

Installation and   
servicing  

To assure a proper and safe operation, as well as a long life of the valve, the installation 
procedure and a periodical servicing are very important topics and the following instructions 
should be always fulfilled. 

IMPORTANT: before proceeding with the installation, ensure that all the features of your system 
are comply with the specifications of the valve (gas type, operating pressure, flow rate, ambient 
temperature, electrical voltage, etc.). 

 

CAUTION 

Shut off the gas supply at the main manual shut-off valve and disconnect electrical 
power to the valve before proceeding installation or servicing. 

 

 
 

 PIPING  CONNECTION 

Check correspondence of flow direction with arrow printed on valve body.  

Check correct alignment of connecting pipes. 

Ensure that installing area is protected from rain and water splashes or drops. 

Remove the end caps and make sure no foreign body is entered into the valve during 
handling. 

 

THREADED MODELS 

Put sealing agent onto the pipe thread. Avoid excessive quantities which could enter in the 
valve and damage the seal seat. 

Screw the pipes using proper tools only. Do not use unit as lever because damage to the 
valve stem could result. 

 

FLANGED MODELS 

Position the gasket or sealing agent on the flanges and insert the bolts with washers. 

Screw the nuts tightening them crosswise and using proper tools only. Avoid overtightening 
and mount tension free. 

 

Following chart shows the maximum values of bending moment (Fmax), torque (Tmax) and 
screws driving torque (Cmax), according to EN161. 

Tab. 5 

 

 
 
 
 
 
 
 
 
 
 
 

 

  

    Fig. 4 

 

Valve may be mounted with coil in horizontal or vertical position. Coil may be oriented 360 
degrees in any direction. 

 

Connections

F

max

 

(Nm) t<10 s 

T

max

 

(Nm) 

C

max

 

(Nm) 

Rp3/8 70 

35 

Rp1/2 105 

50 - 

Rp3/4 225 

85 - 

Rp1 340 

125 

Rp1¼ 475 

160 

Rp1½ DN40

610 

200 

50 

Rp2    DN50

1100 

250 

50 

DN65 1600 

- 50 

DN80 2400 

- 50 

DN100 5000 -  80 
DN125 6000 - 160 
DN150 7600 - 160 
DN200 7600 - 160 

Maximum 90°
from vertical 

Содержание EVRM-6N

Страница 1: ...elektrogas com EVRM NC EVRM 6NC Safety solenoid valves for gas Manual reset Normally closed DN10 DN200 EE166 0407...

Страница 2: ...ason power supply goes down the valve closes immediately intrinsic safe An incorporated fine mesh filter protects the valve seat and disc as well as downstream components and prevents dirty contaminat...

Страница 3: ...s rapidly and remains shut upon return of same Once the causes for the lock have been eliminated valve must be opened manually as described above Fig 1 The 6NC versions are provided with a dual shutte...

Страница 4: ...ing kit must be required The threaded models Rp11 2 and Rp2 can be provided with flanged connections using an optional kit All the valves may be provided with Ex proof marking in accordance with the 9...

Страница 5: ...12 9 5 85 96 158 180 1 1 Rp 1 12 12 0 85 96 158 180 1 1 Rp 11 4 12 20 0 120 153 188 220 2 Rp 11 2 12 26 0 120 153 188 220 2 Rp 2 12 40 0 106 156 192 230 2 3 DN 40 1 12 26 0 150 193 188 262 110 4x18 3...

Страница 6: ...80 60 40 50 30 20 30 10 20 20 40 30 60 50 50 40 70 60 800 600 500 400 700 300 200 100 70 80 100 200 300 200 500 400 400 300 600 500 4000 5000 3000 2000 1000 600 700 800 1000 700 800 1000 2000 3000 40...

Страница 7: ...e with the characteristic Kvs value which is shown in table 2 The selection of the valve requires the calculation of the Kv under the operating conditions Considering only subcritical pressure drops 2...

Страница 8: ...NC6A EVRM6NC6A Rp 2 EVRMNC4AF EVRM6NC4AF DN 40 1 EVRMNC6AF EVRM6NC6AF DN 50 1 EVRMNC7A EVRM6NC7A DN 65 EVRMNC8A EVRM6NC8A DN 80 EVRMNC9 EVRM6NC9 DN 100 EVRMNC93 EVRM6NC93 DN 125 EVRMNC95 EVRM6NC95 DN...

Страница 9: ...C and the certification has been issued by the notified body C S I Spa Viale Lombardia 20 I 20021 Bollate MI The following standards technical specifications have been fulfilled Electromagnetic Compat...

Страница 10: ...emove the end caps and make sure no foreign body is entered into the valve during handling THREADED MODELS Put sealing agent onto the pipe thread Avoid excessive quantities which could enter in the va...

Страница 11: ...and insert the rectifier unit into the housing Screw back the gland nut make sure that the grommet is locked on the cable Insert the screw and gasket into the housing and screw back the plug on the c...

Страница 12: ...s corrosion free Take attention to the assembly direction of the spring Clean the plunger assembly 11 13 14 with a clean cloth and compressed air Grease the rod O rings Check the conditions of the sea...

Отзывы: