background image

ELEKTROGAS – MANUALE TECNICO 

 7-12 

 

 

 
When the flow read on the diagram is referred to operating pressure instead of standard 
conditions, the pressure drop 

p read on the diagram must be multiplied for the factor: 

(1+ relative pressure in bar)  
 

Example: 

 
In the 2” solenoid valve with an air flow of 80 Nm

3

/h there is a pressure drop 

p = 5 mbar. 

If we consider that 80 m

3

/h is the flow at 200 mbar of inlet pressure, then the pressure drop to 

be consider is:  
 

p = 5x(1+0,2) = 6 mbar 

 
 
 
 
Normally, pressure drop and flow rate for the valves are read from the gas flow diagram. 
However, the valves can also be chosen in accordance with the characteristic ”Kvs value” which 
is shown in table 2. 
The selection of the valve requires the calculation of the Kv under the operating conditions. 
 
Considering only subcritical pressure drops: 
 

2

1

p

p

<

 

 
Kv can be calculated with the formula: 
 

(

)

2

273

514

p

p

t

V

Kv

+

=

ρ

 

 
where 
 
V  

= flow rate [Nm

3

/h] 

Kv   = flow factor [m

3

/h] 

ρ

  

= density [Kg/m

3

p

1

   = absolute inlet pressure [bar] 

p

2

   = absolute outlet pressure [bar] 

p   = differential pressure p

1

-p

2

 [bar] 

t  

= media temperature [°C] 

 
 
To the Kv value calculated from operating conditions we add an allowance of 20%, to obtain the 
minimum Kvs value which the valve should have:  
 

Kvs > 1,2 Kv 

 
 
 
 
 
Valve must be selected considering the following: 
 
- Pressure 

drops 

 0,1p

1

 are recommended and 

p > p

1

/2 are always unadvisable 

- Flow 

velocities 

 15 m/s are recommended and w > 50 m/s are always unadvisable. 

 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание EVRM-6N

Страница 1: ...elektrogas com EVRM NC EVRM 6NC Safety solenoid valves for gas Manual reset Normally closed DN10 DN200 EE166 0407...

Страница 2: ...ason power supply goes down the valve closes immediately intrinsic safe An incorporated fine mesh filter protects the valve seat and disc as well as downstream components and prevents dirty contaminat...

Страница 3: ...s rapidly and remains shut upon return of same Once the causes for the lock have been eliminated valve must be opened manually as described above Fig 1 The 6NC versions are provided with a dual shutte...

Страница 4: ...ing kit must be required The threaded models Rp11 2 and Rp2 can be provided with flanged connections using an optional kit All the valves may be provided with Ex proof marking in accordance with the 9...

Страница 5: ...12 9 5 85 96 158 180 1 1 Rp 1 12 12 0 85 96 158 180 1 1 Rp 11 4 12 20 0 120 153 188 220 2 Rp 11 2 12 26 0 120 153 188 220 2 Rp 2 12 40 0 106 156 192 230 2 3 DN 40 1 12 26 0 150 193 188 262 110 4x18 3...

Страница 6: ...80 60 40 50 30 20 30 10 20 20 40 30 60 50 50 40 70 60 800 600 500 400 700 300 200 100 70 80 100 200 300 200 500 400 400 300 600 500 4000 5000 3000 2000 1000 600 700 800 1000 700 800 1000 2000 3000 40...

Страница 7: ...e with the characteristic Kvs value which is shown in table 2 The selection of the valve requires the calculation of the Kv under the operating conditions Considering only subcritical pressure drops 2...

Страница 8: ...NC6A EVRM6NC6A Rp 2 EVRMNC4AF EVRM6NC4AF DN 40 1 EVRMNC6AF EVRM6NC6AF DN 50 1 EVRMNC7A EVRM6NC7A DN 65 EVRMNC8A EVRM6NC8A DN 80 EVRMNC9 EVRM6NC9 DN 100 EVRMNC93 EVRM6NC93 DN 125 EVRMNC95 EVRM6NC95 DN...

Страница 9: ...C and the certification has been issued by the notified body C S I Spa Viale Lombardia 20 I 20021 Bollate MI The following standards technical specifications have been fulfilled Electromagnetic Compat...

Страница 10: ...emove the end caps and make sure no foreign body is entered into the valve during handling THREADED MODELS Put sealing agent onto the pipe thread Avoid excessive quantities which could enter in the va...

Страница 11: ...and insert the rectifier unit into the housing Screw back the gland nut make sure that the grommet is locked on the cable Insert the screw and gasket into the housing and screw back the plug on the c...

Страница 12: ...s corrosion free Take attention to the assembly direction of the spring Clean the plunger assembly 11 13 14 with a clean cloth and compressed air Grease the rod O rings Check the conditions of the sea...

Отзывы: