12
►Connecting the ST module to the machine
♦
LC hydraulic part
With a cappuccino LC the refrigerator is delivered with the pipe already fitted in the refrigerator, it remains
simply to feed it through the plate prepared for the purpose and fix it to the cappuccino outlet end.
►Installing the bins
To avoid damage during transport, machines are
delivered with the bins removed
INSTALLING THE BINS:
- The bins are fixed from behind. Respect the
direction of fitting.
- Position the closing trap on the bins; pay attention
to the direction of the opening of the trap.
- Access to the trap is by removing the side.
- Capacity: 1.7 kg (4,5 liters) for the large bin.
- Capacity: 1.2 kg (3 liters) for the small bin.
INSTALLING POWDER BIN:
- Remove the powder cover forwards (locked by
the lock).
- The hoppers are fixed from the rear. Observe the
mounting direction (picture).
- Reposition the cover and lock.
CAUTION:
Air must be able to circulate freely around the machine. The ventilation openings located at the rear of the
machine and on the top must not be obstructed.
The machine must not operate without its legs.
Содержание TANGO 3 XL
Страница 2: ......
Страница 61: ...61 Tango 0060 5 2021 ...
Страница 63: ......
Страница 68: ...7 ace TANGO ACE TANGO ACE MT ...
Страница 84: ...23 ace Maintenance Component test p 39 Cooling machine p 40 History of errors p 40 Softener p 40 ...
Страница 106: ...45 ace Static relays ...
Страница 110: ...49 ace 01 17 506 FUSIBLES CARTE MERE ACE MOTHERBOARD FUSES FN4 FN5 FN6 FN3 FN10 FN9 FN7 FN1A FN1B FN1C FN1D FN8 FN2 ...