6.2
Before normal operation of the shower, it is
essential that the following commissioning
procedure is completed correctly.
The following operation is intended to flush
out any remaining debris, and to make sure
the heater unit contains water before the
heating elements are switched on.
1.
Make sure the flexible hose screwed to
the water outlet but WITHOUT THE
SHOWERHEAD ATTACHED and the outlet
of the flexible hose is directed to waste.
2.
Before turning on the electric and mains
water supplies to the shower, make sure
that you rotate the temperature adjuster fully
anti-clockwise to minimum position “ ” and
the water flow controler is rotated fully
clockwise to the “ Mix ” position as shown
on Fig.15.
3.
Turn on the mains water supply to the
shower at the isolating stopvalve and then
turn on the electric supply to the shower at
the isolating switch.
CAUTION!
Failure to turn the water flow knob to
the minimum flow position MAY cause
the PRD(Pressure Relief Device) to
operate.
CAUTION!
Before first use
Fig. 15
Fig. 14
Fig. 16
4.
Press the On/off button and wait until
water starts to flow from the flexible hose.
5.
Slowly rotate the water flow controler fully
anti-clockwise to the “Max” flow position
(Fig. 16). It will take about thirty seconds for a
smooth flow of water to be obtained while air
and any debris is flushed from the shower.
18 www.electrolux.com
Rotate the temperature
adjuster fully
anti-clockwise to the
“ ” position.
Turn the water flow
knob fully clockwise
to “Min” flow.
Slowly turn the water flow
controler to the “Max” flow
position.