- 28 -
Spares Operation - R.Kurzke 02/03
599 516 219
EN
Replacement
of the panel
Remove the screws from the
panel frame.
Remove the turning knob.
Carefully unclip the front .
Before finally opening, unclip
the lamps.
Remove the
base plate
The base plate of the machine
is held with screws on the
lower panel and at the bottom.
Lay the machine on its back
and lift off the base plate.
It contains the bosses for the
overflow water and the
flooding switch.
After removal you come to the
most important functional
components.
Содержание Compact
Страница 12: ... 12 Spares Operation R Kurzke 02 03 599 516 219 EN 5 Water Course Scheme ...
Страница 22: ... 22 Spares Operation R Kurzke 02 03 599 516 219 EN 14 Wirings Example DSC 14 ...
Страница 23: ... 23 Spares Operation R Kurzke 02 03 599 516 219 EN Diagram Example DSC 14 ...
Страница 24: ... 24 Spares Operation R Kurzke 02 03 599 516 219 EN Wirings Example DSC 382 ...
Страница 25: ... 25 Spares Operation R Kurzke 02 03 599 516 219 EN Diagram Example DSC 382 ...
Страница 40: ... 40 Spares Operation R Kurzke 02 03 599 516 219 EN 16 ...
Страница 41: ... 41 Spares Operation R Kurzke 02 03 599 516 219 EN ...
Страница 42: ... 42 Spares Operation R Kurzke 02 03 599 516 219 EN ...