Float switch
The float switch is snapped out with
a small screwdriver and can be
taken out of its mounting.
After removing the protective cap,
the microswitch can be snapped
out.
Programmer
The programmer is secured to the front of the
chassis by means of two screws.
Remove the programmer from the right side of the
chassis.
Switch unit
The switch unit is secured by means of screws and easily to
remove.
Inlet valve
The inlet valve is mounted in the same place as the float switch.
After the removal of the hose, the valve can be drawn out of the
chassis with suitable pliers.
Содержание Compact
Страница 12: ... 12 Spares Operation R Kurzke 02 03 599 516 219 EN 5 Water Course Scheme ...
Страница 22: ... 22 Spares Operation R Kurzke 02 03 599 516 219 EN 14 Wirings Example DSC 14 ...
Страница 23: ... 23 Spares Operation R Kurzke 02 03 599 516 219 EN Diagram Example DSC 14 ...
Страница 24: ... 24 Spares Operation R Kurzke 02 03 599 516 219 EN Wirings Example DSC 382 ...
Страница 25: ... 25 Spares Operation R Kurzke 02 03 599 516 219 EN Diagram Example DSC 382 ...
Страница 40: ... 40 Spares Operation R Kurzke 02 03 599 516 219 EN 16 ...
Страница 41: ... 41 Spares Operation R Kurzke 02 03 599 516 219 EN ...
Страница 42: ... 42 Spares Operation R Kurzke 02 03 599 516 219 EN ...