14
Fitting
the
Wall
Brackets
Wall marking:
• Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the centre of the area
in which the hood will be installed.
• Draw a horizontal line at 650 mm above the hob.
• Place bracket
7.2.1
on the wall as shown about 1-2 mm from the ceiling or upper limit aligning the centre (notch)
with the vertical reference line.
• Mark the wall at the centres of the holes in the bracket.
• Place bracket
7.2.1
on the wall as shown at X mm below the fi rst bracket (X = height of the upper chimney
section supplied), aligning the centre (notch) with the vertical line.
• Mark the wall at the centres of the holes in the bracket.
• Mark a reference point as indicated at 116 mm from the vertical reference line and 320 mm above the horizontal
reference line.
• Repeat this operation on the other side.
• Drill ø 8 mm holes at all the centre points marked.
• Insert the wall plugs (not supplied) in the holes.
• Fix the lower bracket
7.2.1
using the two screws (not supplied).
• Fix the upper bracket
7.2.1
and the air outlet connection support
7.3
together using the two screws (not sup-
plied).
• Insert the two screws
12a
(not supplied) supplied in the hood body fi xing holes, leaving a gap of 5-6 mm
between the wall and the head of the screw.
Note: If the hood is to be installed onto a hollow construction or plaster or partition board wall then special
fi xing screws will be required (not supplied).
INSTALLING THE COOKER HOOD
11
12a
320
X
116
1÷2
116
650 min.
7.2.1
Содержание CH 910
Страница 1: ...INSTRUCTION BOOK FOR ELECTROLUX COOKER HOOD CH 910 cod 436002577_01 050329 UK ...
Страница 2: ......
Страница 5: ...5 YOUR APPLIANCE 740 870 1200 260 300 64 42 650 min 490 60 598 698 898 1198 108 150 ...
Страница 18: ......
Страница 19: ......