Screw plaster guard onto face of assembly
(See Fig. 18).

Drop bottom of tubing through 2-1/4" (5.7cm)
hole and nail stud mounting bracket assembly
to stud. Make sure center of inlet hole is at the
correct height above floor level and tubing
extends below sub-flooring.

Be sure to install a nail guard when holes are
drilled through the sole or top plates. This is to
prevent a nail or screw from penetrating the
vacuum tubing. Go to STEP 2 “Installation of
Tube System” and complete tubing system as
much as possible.

After the walls are finished and painted, the
plaster guards will be removed and inlet valves
installed. The tubing system may be completed
at that time and the power unit installed.

STEP 2: Installation of Tube System
(New or Existing Structure)

Starting at the inlet furthest from the power unit,
temporarily fasten the main line in position.
(Good idea: - From a nail or overhead pipe,
etc., make two loops of string or low-voltage
wire to pass PVC tubing through, to hold it in
position while you work.) 
Push a length of PVC tubing up into bottom of

inlet valve assembly. Bear in mind, tube enters
all fittings approximately 3/4" (1.9cm). Measure,
cut, and slip-fit this vertical line to main horizon-
tal line with a 90 degree sweep elbow. 

To  avoid potential clogging problems when
installing tubing and fittings, here are some rec-
ommendations:

Always make straight cuts on tubing

Always remove burrs from end of tubing. 

Be sure tubing fits against shoulder of fitting
with no gaps.

Glue tubing side only before assembly into
fittings.

Connect additional inlet valves to main trunk
line with the 90 degree sweep tee (Fig. 19).

Be sure to install sweep tee fittings so sweep
is towards power unit (Fig. 20).

Always run branch lines, from sides or top of
main trunk line, never out of the bottom, as this
will create a trap for dirt to fall into.

Bring low-voltage wire along as you assemble
tubing.
Join or splice wire with wire connectors at each
branch or junction in the tubing. Neatly tape
wire to tube. Proceed until the tubing system is
complete.

Содержание Afuera

Страница 1: ...Do It Yourself Planning Installation Manual for your new AFUERATM Central Cleaning System ...

Страница 2: ...d than wall valves and sometimes are the only practical installation They have some dis advantages as the hose must be inserted at the floor level rather than at a more convenient wall height Wall height is a matter of individual preference Some homeowners prefer the inlet at a convenient fingertip height about 30 inches 76cm while oth ers want it to match the electric outlet height STEP 2 Choose ...

Страница 3: ...imum stud width for sufficient clearance for inner wall mounting bracket assembly is 2 3 4 7cm See Fig 3 above b Using METAL Stud Mounting Bracket Centered at the desired height above floor level cut an almost square opening 2 3 4 7cm wide by 2 1 2 6 35cm high in the wall directly above the 2 1 4 5 7cm sole plate hole Cut or file two 3 4 1 9cm high triangular pieces above and below the almost squa...

Страница 4: ... of tubing joined by couplings may be required due to overhead space restric tions Precut these pieces and work quickly to prevent the cement on the end of the tubing from drying before it reaches the fitting at the valve below c Using PLASTIC Stud Mounting Bracket Having determined the location is suitable cut a 2 1 2 6 35cm x 4 3 8 11cm hole in the wall at the desired inlet valve loca tion See F...

Страница 5: ...ce restric tions Precut these pieces and work quickly to prevent the on the end of the tubing from drying before it reaches the fitting at the valve below d Floor Valves To install a floor inlet drill a pilot hole with a coat hanger and check the location as previously described When you are sure that the pro posed location will not be blocked by a joist or other obstruction cut a hole in the carp...

Страница 6: ...e metal bracket Attach wires to low voltage terminals at rear of inlet valve Place inner wall assembly lengthwise through wall opening and arrange assembly so that metal bracket is flush with inside surface of wall Screw inlet to wall as described previous ly in STEP 1 then complete as per Fig 16 f Wall Valve Installation New Construction Select a probable location for inlet valve and drill a pilo...

Страница 7: ...ing or low voltage wire to pass PVC tubing through to hold it in position while you work Push a length of PVC tubing up into bottom of inlet valve assembly Bear in mind tube enters all fittings approximately 3 4 1 9cm Measure cut and slip fit this vertical line to main horizon tal line with a 90 degree sweep elbow To avoid potential clogging problems when installing tubing and fittings here are so...

Страница 8: ... provided Do not cement this connection to the power unit in case you wish to remove at some future date Do not install power unit where the ambient temperature exceeds 120 degrees Fahrenheit 48 9 degrees C NOTE For top loading units follow directions provided with unit This unit may be exhausted to exterior to expel fumes germs and some noise Use the same tubing and fittings as before If vented t...

Страница 9: ...circuit and has a ground plug that looks like the plug illustrated in figure 21 for North American units For 220 230 240 volt units consult your local building code electri cian Make sure that the appliance is connected to an outlet having the same configuration as the plug No adapter should be used with this appliance Check power unit On Off switch and all inlet valves for operation This power un...

Страница 10: ...air face fingers and loose clothing away from any openings 9 Do not pick up cigarettes live hot ashes matches or similar materials 10 Never operate vacuum without dust bag and or filter in place 11 To disconnect turn all controls to the OFF position then remove plug from outlet 12 Never handle plug cord or power unit with wet hands 13 Electric shock could occur if used on wet surfaces 14 Use extra...

Отзывы: