Revised January 22, 2018
LX2350-4 Owner's Manual
www.electro-mech.com · 800.445.7846
Page 21
Finalizing
With the completed four-faced assembly resting on the floor, you may now attach
cables, chains, etc. from the support mechanism to the eye bolts in the tops of the
scoreboard faces. If you've designed the power and data cabling to reach the
scoreboard cabinets while they are still on the floor, you should make those connections
now and test the system before raising it. Otherwise, you should be ready to raise the
assembly into its final position. Make the connections described in the "Electrical
Installation" section of this document. Notes on testing and operation appear on the
next few pages.