Installation Requirements 

 
1.

 

All installation work must be performed by trained, qualified contractors or technicians.  Electro 
Industries, Inc., sponsors installation and service schools to assist the installer.  

Visit our web site at 

electromn.com for upcoming service schools.

 

2.

 

All electrical wiring must be in accordance with national electric codes and local electric codes, 
ordinances, and regulations. 

3.

 

Observe electric polarity and wiring colors.  Failure to observe could cause electric shock and/or damage 
to the equipment. 

4.

 

This unit can only be used for its intended design as described in this manual.  Any internal wiring 
changes, modifications to the circuit board, modifications or bypass of any controls, or installation 
practices not according to the details of this manual will void the product warranty and manufacturer 
product liability.  Electro Industries, Inc., cannot be held responsible for field modifications, incorrect 
installation, and conditions which may bypass or compromise the built-in safety features and controls. 

 

Mechanical Installation 

 
Insert this unit in a round duct arrangement.  The air filtering and air moving devices are external to this unit.  
FIGURE 1 shows a typical arrangement. 
 

Note: 

A minimum of a 24” duct section is required at the outlet for installation of the temperature 

sensing probe. 

 

Clearance – Duct Surface Areas, Duct Installation, Etc. 

 

When installed in an “inline” duct or round pipe adapter for a general distribution boost heater or air make-
up application, observe the following guidelines: 

1.

 

This product must be installed in a metal duct, size of the element rack. 

2.

 

There shall be no insulation on the inside of this sheet metal duct section. 

3.

 

Any flex-pipe or other insulated pipe must be at least 24” from the electric element. 

4.

 

The control box must be positioned so it will not receive water dripping or collection of moisture. 

5.

 

See next section on duct sensor installation. 

 

Duct Sensor 

 

This unit is equipped with a remote temperature-sensing probe.  This is a solid state probe (actually mini-micro 
computer chip at the end of the probe), handle with care. 
 
Suggested installation is in the main warm air stream approximately 20 to 24 airflow inches away from the 
electric element.  Simply drill a ½” hole in the duct, insert probe, and screw in place. 
 

Comment: 

The sensor tip within the tube should be at the end of the tube or slightly extending beyond 

the tube.  If this is not the case, very carefully push the cable (do not grab the sensor tip with pliers) until 
the sensor tip can effectively sample the warm air. 

 
Coil and tie excess cable.  It should be connected to the Red, ST, and COM screw terminals. 
 

 

WARNING

 

IF THE BLACK AND RED SENSOR WIRES ARE CROSSED OR INCORRECTLY INSTALLED AT THE 
TERMINAL BLOCK AND POWER IS TURNED ON, BURNOUT DAMAGE CAN RESULT WITHIN 
THE SENSOR PROBE. 

 

Содержание EM-WX02-240-1-08

Страница 1: ...ecific Application Air exchanger temperature boost Make up air Temperature comfort boost Comment This module is a heating element and controller to temper the inlet air and bring it to a comfortable level This unit contains a built in controller with duct sensor to modulate the electric element part of this unit using only the required electric energy to reach comfort level This is more than basic...

Страница 2: ... motorized dampers This unit depends upon an external blower or air moving device providing minimal airflow across the electric elements before turning the unit on Minimum airflow relates to temperature rise needs or design Table 2 CFM Chart provides these CFM numbers FIGURE 1 Table 1 Electrical Requirements Model kW Btu h Nameplate Current Duct Collar EM WX02 240 1 08 2 5 8 500 10 5 8 EM WX05 240...

Страница 3: ... temperature sensing probe Clearance Duct Surface Areas Duct Installation Etc When installed in an inline duct or round pipe adapter for a general distribution boost heater or air make up application observe the following guidelines 1 This product must be installed in a metal duct size of the element rack 2 There shall be no insulation on the inside of this sheet metal duct section 3 Any flex pipe...

Страница 4: ...ocking contact airflow switch danger end switch etc which is necessary to prevent unsafe operation arrange your control circuit to apply 24VAC power when you want boost heat SUMMER OR COOLING DISABLE This module must be disabled during the cooling cycle to prevent adding heat to the air conditioning operation Select one of the following 3 installation techniques or methods A Extend HP reversing va...

Страница 5: ...ge Options MODE DIAL WARM AIR DIAL 0 1 2 3 4 5 6 7 0 10 14 38 62 86 110 134 MUA II 1 7 17 41 65 89 113 137 2 4 20 44 68 92 116 140 3 1 23 47 71 95 119 140 4 2 26 50 74 98 122 140 5 5 29 53 77 101 125 140 6 8 32 56 80 104 128 140 7 11 35 59 83 107 131 140 Checkout and Calibration There is no field calibration or adjustments Total element turn on can be accomplished by jumpering system R 24 volts to...

Страница 6: ......

Страница 7: ......

Страница 8: ...acement Labor Allowance Schedule for a period of ninety 90 days from the date of original purchase to the original owner at the original installation site The Repair Replacement Labor Allowance is designed to reduce the cost of repairs This Repair Replacement Labor Allowance may not cover the entire labor fee charged by your dealer contractor TWENTY YEAR 20 LIMITED WARRANTY ON BOILER ELEMENTS AND ...

Страница 9: ...ubject to adjustment upon verification of defect 2 Any product or product part that has been damaged as a result of being improperly serviced or operated including but not limited to the following operated during construction phase with insufficient water or air flow allowed to freeze subjected to flood conditions subjected to improper voltages or power supplies operated with air flow or water con...

Отзывы: