background image

     

Doc

#    

E149704   V.1.08     

          

             QS - 3

                          Shark® 200T Quickstart

Electro 

Industries/GaugeTech

Powered by Innovation™

Electrical Installation: 

Select diagram for your application.

lc

HI

LO

lb

HI

LO

la

HI

LO

Earth Ground

L(+)

Power 
Supply
Connection

N(-)

L(+)

GND

N(-)

Vref

Va

Vb

Vc

LINE

LOAD

CT 
Shorting
Block

 FUSES
3 x 0.1A

 FUSE

3A

C

C

B

B

A

A

lc

HI

LO

lb

HI

LO

la

HI

LO

Earth Ground

Earth Ground

L(+)

Power 
Supply
Connection

N(-)

L(+)

GND

N(-)

Vref

Va

Vb

Vc

LINE

LOAD

CT 
Shorting
Block

 FUSES
3 x 0.1A

 FUSE

3A

C

C

B

B

A

A

N

N

lc

HI

LO

lb

HI

LO

la

HI

LO

Earth Ground

L(+)

Power 
Supply
Connection

N(-)

L(+)

GND

N(-)

Vref

Va

Vb

Vc

LINE

LOAD

CT 
Shorting
Block

 FUSES
3 x 0.1A

 FUSE

3A

C

C

B

B

A

A

N

N

lc

HI

LO

lb

HI

LO

la

HI

LO

Earth Ground

Earth Ground

L(+)

Power 
Supply
Connection

N(-)

L(+)

GND

N(-)

Vref

Va

Vb

Vc

LINE

LOAD

CT 
Shorting
Block

 FUSES
2 x 0.1A

 FUSE

3A

C

C

B

B

A

A

WYE direct, 3 
phase, 4 wire

Delta direct, 3 
phase, 3 wire

WYE with PTs, 
3 phase, 4 wire

Delta with PTs, 3 
phase, 3 wire

Содержание Shark 200T

Страница 1: ...t Guide gives basic installation wiring and programming instructions For additional meter opera tion and programming information refer to your meter s Installation and Operation Manual and the Communicator PQATM MeterManagerPQATM and EnergyPQA comTM Software User Manual on EIG s website User Manual https www electroind com products shark 200 data logging power meter transducer From the webpage cli...

Страница 2: ...Press gently until the meter clicks into place If mounting with DIN Rail provided use Black Rubber Stoppers also provided shown above To remove meter pull down on the Release clip DIN Installation 200T Dimensions DIN Rail with black rubber stoppers Release Clip v CM v CM Ic Ib Ia HI HI HI LO LO LO v CM v CM CM CM v CM Release Clip DIN Rail with Black Rubber Stoppers 200 T Dimensions ...

Страница 3: ...Ground L Power Supply Connection N L GND N Vref Va Vb Vc LINE LOAD CT Shorting Block FUSES 3 x 0 1A FUSE 3A C C B B A A N N lc HI LO lb HI LO la HI LO Earth Ground L Power Supply Connection N L GND N Vref Va Vb Vc LINE LOAD CT Shorting Block FUSES 3 x 0 1A FUSE 3A C C B B A A N N lc HI LO lb HI LO la HI LO Earth Ground Earth Ground L Power Supply Connection N L GND N Vref Va Vb Vc LINE LOAD CT Sho...

Страница 4: ... s RS485 port uses standard 2 wire half duplex architec ture Factory Initial Default Settings When the Shark 200 is powered up for 10 seconds you can connect to the meter using the Factory Default Settings even if the Device Profile has been changed After 10 seconds the Device Profile reverts to the actual Device Profile in use This is one way you can always connect to the meter The Factory Initia...

Страница 5: ...nverter 2 Open CommunicatorPQATM software see page QS 1 for the download link 3 Click Connect in the Icon Bar 4 You will see the Connect screen Make sure your settings match the ones shown on the right use pull down menus 5 Click Connect The Device Status screen confirms the connection Click OK to close the Device Status screen 6 Click the Profile button on the Icon bar 7 The Device Profile screen...

Страница 6: ...ge Full Scale PT Numerator x PT Multiplier Current Full Scale CT Numerator x CT Multiplier IMPORTANT Specify Primary and Secondary Voltage in Full Scale NOT Ratios NOTE You can also enter the Ratios for CT PT Numerator and Denominator and click the Update CT Update PT buttons to let the software calculate the Numerator Denominator and Multiplier for you You can then empty the Ratio fields and clic...

Страница 7: ...er Time The meter is preset to Eastern time To change the meter time 1 From the Main screen s Title bar click Tools Set Device Time 2 You can either enter the time in the Time fields or click Use PC Time to set the time using your PC s time 3 Click Send NOTE The meter offers multiple Time Synchronization meth ods See Chapter 8 Section 8 1 2 in the software manual see page QS 1 alternatively you ca...

Страница 8: ...the other settings in this screen IMPORTANT When you have made changes to the meter s Device Profile click Load Profile at the bottom of the Device Pro file screen to send the new settings to the meter The meter will reboot and then you can reconnect to it Note that you can also click Save Profile to save your changes without sending them to the meter Shark is a registered trademark of Electro Ind...

Отзывы: