17
INSTALLATION INSTRUCTIONS
Welding detection
The signal for welded power contacts is connected
to position 6 of the interface board (see fig. p. 16).
A change-over contact (max. 230 V, 1 A) is available,
which can be used according to the installer’s
requirements.
12 V / 24 V variant
Interface board
Fuse box
Circuit
breaker
L1
12 V / 24 V DC
2 A max
e.g. ABB F2C-A1
Mechanical
coupling
GND
L2 L3 N
L1 L2 L3 N
40 A
To Dock mains board
Welding
indicator
COM
NC
NO
01
Drill a suitable hole for the M20 cable gland using the
step drill. Drill step by step to ensure that the hole is not
too large and that there is no leakage after the cable
gland has been installed. Insert the M20 cable gland.
02
Replace the routing plate in the Dock, and press this on
firmly to ensure tightness.
03
Insert the S/FTP cable (Ethernet cable) through the
M20 cable gland and the cable ducts and secure
the cable under clip 4a or 4b. Route the cable to the
clip, strip the insulation, and use an SLA-Plus tool to
place it on the LAN 2 LSA-Plus terminal strip (7) of
the interface board.
04
Tighten the cable gland to ensure tightness.
M20 cable gland
Cable routing plate
8
RX-
RX-
RX+
RX+
TX-
TX-
LA
N 1
LA
N 2
se
t f
re
e
TX+
TX+
Not used.
6
3
2
1
Содержание innogy eBox professional
Страница 1: ...Dock installation instructions...
Страница 2: ...2 DOCK INSTALLATION INSTRUCTIONS...
Страница 25: ...25 NOTES...
Страница 26: ...26 DOCK INSTALLATION INSTRUCTIONS...