manualshive.com logo in svg
background image

Spectrum Hybrid

UV + Hydroxyl Radical Pool Sanitiser

Installation & Operating Manual

Содержание Spectrum Hybrid SH-110

Страница 1: ...Spectrum Hybrid UV Hydroxyl Radical Pool Sanitiser Installation Operating Manual...

Страница 2: ...ENGLISH www elecro co uk...

Страница 3: ...electricity and turn off the water supply before carrying out maintenance Always disconnect all pool appliances from the mains electricity supply before servicing Power must be supplied through a Res...

Страница 4: ...ogue lamp life indicator and reset switch or digital lamp life countdown with intelligent dosing pump Fig 1 FLOWTUBE COVER CONTROL BALLAST ASSEMBLY BULB RETAINING CLIP BULB CAP LOCKING NUT O RING UV B...

Страница 5: ...WTUBE COVER UV LAMP RETAINING CLIP LOCKING NUT O RING UV LAMP QUARTZ GLASS SLEEVE BRACKET ELECTRONIC CONTROLLER ASSEMBLY UV LAMP CAP CONTROL BALLAST ASSEMBLY MANIFOLD ASSEMBLY Fig 2 110W Double Tube U...

Страница 6: ...ly or vertically It must not be submerged in water or placed in a position where water may collect around the unit To prevent the unit inadvertently being dropped into the pool the unit must be instal...

Страница 7: ...lied with a fixing kit The unit can be mounted vertically as shown in the next pages in fig 5 and 6 or horizontally as shown in fig 7 NOTE When mounting the UV it is essential to leave a clearance spa...

Страница 8: ...www elecro co uk 1 ENGLISH WASHER x 4 RAW PLUG x 4 SCREW x 4 Washer x5 Screw x5 Raw plug x5 Fig 5 6 55W Single Tube Unit...

Страница 9: ...2 www elecro co uk ENGLISH RAW PLUG x 5 WASHER x 5 SCREW x 5 Fig 6 7 110W Double Tube Unit...

Страница 10: ...ube Unit Horizontal mounting 55W Single Tube Unit Vertical mounting Horizontal mounting 8 Water must enter low and exit high Water must enter low and exit high Factory Default Optional reverse flow ex...

Страница 11: ...g 8 For connection to 63mm or 2 diameter pipe Insert 63 mm diameter pipe up to this stop Insert 2 diameter pipe up to this stop A D H E S I V E ABS PVC Insert 50 mm diameter pipe up to this stop Inser...

Страница 12: ...ted by more than 5mm from its housing and turned with force If the flow switch has been rotated it is important to ensure that it is finally locked in the correct orientation perpendicular at right an...

Страница 13: ...r this set period of time At initial Power On of the Spectrum Hybrid the LED indicator will light in Red colour for one second to indicate that the time setting is 9 000 hours and immediately change c...

Страница 14: ...www elecro co uk ENGLISH 12 Fig 9 LAMP LIFE INDICATOR RESET SWITCH...

Страница 15: ...nect the suction tube to the dosing pump This is how the completed assembly will look STEP ONE Components required Tubing Foot Valve Strainer STEP TWO Unscrew securing cap anti clockwise Lamp Life Ind...

Страница 16: ...pe onto component 3 STEP FOUR Once all components are looped through the tubing tighten securing cap STEP FIVE Lastly unscrew the retaining gland and insert tube over the connection point Tighten the...

Страница 17: ...ctory default setting for the language is English To change to another language press the buttons until the de sired language appears press OK to select and save Language English OK Fig 12 Fig 11 DIGI...

Страница 18: ...e switched on unless the unit is receiving sufficient flow See page 10 for flow requirements UV Lamp Life Adjust Dose The digital controller has three modes ie UV LAMP LIFE DOSAGE TIMER Whenever the U...

Страница 19: ...set or adjust the dosage requirement Press the buttons to scroll through the options until ADJUST DOSE mode is displayed and press the O K button to select When the UV lamp s are replaced the lamp li...

Страница 20: ...value has been stored in the memory Set Timer After setting the required dosage it is necessary to set the start time which is adjustable from 2 minutes to 23 hours 59 minutes in 1 minute steps please...

Страница 21: ...will need to be reset by the user The unit will not dose at the correct time until the timer is reset although the UV Lamp s will function as normal Intelligent Dosing Pump Routine Maintenance We reco...

Страница 22: ...secur ing ties in place in order to seal to the connection points Once securely in place cut the excess tie and dispose of STEP FIVE Place dosing tube into position on the left hand side Carefully ro...

Страница 23: ...ove the blue lamp holder shroud then pull the white plastic electrical end caps from the lamp end Gently slide the lamp out ensuing that no pressure is applied to the glass quartz sleeve Next unscrew...

Страница 24: ...e the unit to release any trapped air Failure to release the trapped air may cause the lamp holder to disconnect from the lamp end Reconnect and turn on the water supply to check for leaks before reco...

Страница 25: ...potential negative consequences for the environment and human health which could otherwise be caused by inappropriate waste handling of this product The recycling of materials will help to conserve n...

Страница 26: ...g bottom then take the deepest measurement D2 and the shallowest D1 If there are different levels then you need to do several calculations of area for each depth and add them up at the end Rectangle S...

Страница 27: ...on graph paper using a square on the paper to represent a metre or foot square of pool When you have finished count the squares For partial squares count anything over half as one and ignore any unde...

Страница 28: ...itres Multiply by 1000 Cubic Feet to Cubic Metres Multiply by 0 0283168 UK Gallons to Litres Multiply by 4 54609 Litres to Cubic Metres Multiply by 0 001 Cubic Metres to UK Gallons Multiply by 219 969...

Страница 29: ...11 Gunnels Wood Park Stevenage Hertfordshire SG1 2BH United Kingdom t 44 0 1438 749 474 f 44 0 1438 361 329 e sales elecro co uk www elecro co uk Copyright 2016 Z INS SH...

Отзывы: