background image

 

SnowClear Installation, Operator & Maintenance Manual

 

Installation Instructions

   

                                                                                                                                                                                                                                                                                                                                                                

1.

 

This unit should only be installed by a licensed and qualified electrician in accordance with the relevant 
electrical code for your area. 

 

2.

 

This unit must be properly installed before it is 
used. 

 

3.

 

This product does not have an ON/OFF switch 
and is designed to operate with a snow sensor 
and controller to switch on when the sensor 
detects  falling  snow,  and  switch  off  when  it 
detects  that  it  has  stopped  snowing.  This 
device 

operates 

automatically 

when 

connected to the snow sensor. 

 

4.

 

The  Overhead  Melter  is  fitted  with  an 
electrical  connection  box  and  should  be 
connected as a fixed installation by a licensed 
and qualified electrician. 

 

5.

 

The  SnowClear  Overhead  Melter  must  be 
properly grounded.   

 

6.

 

An overcurrent protection device (for example a circuit breaker) is required for proper installation. 

 

7.

 

The SnowClear Overhead Melter is designed for domestic or commerical snow melting application in an 

outdoor

 area and should not be used or modified for any other purpose. 

 

8.

 

Before starting installation, check that the electrical supply voltage is the same as shown on the rating 
plate of the unit 

 

9.

 

Use copper wire only. 

 

10.

 

Only high temperature porcelain wire connectors are to be used for connecting the heating elements to 
the unit. High temperature porcelain wire connectors are supplied with the unit. 

 

11.

 

Do  not  install  the  product  less  than  2.5m  (8.2  feet)  from  the  ground.  The  ideal  installation  height  is 
between 2.5m (8.2 feet) and 3m (10 feet) to achieve maximum coverage of snow melting area. 

 

12.

 

It is recommended to install the unit on the mounting bracket at an angle of between 0° and 20° to the 
ground for maximum effectiveness.  

 

13.

 

The unit can be mounted on a wall, ceiling or a pole. 

 

14.

 

This product is not recommended for use in extremely humid or dusty environments.  

 

15.

 

Wiring  procedures  and  connections  shall  be  in  accordance  with  the  national  and  local  codes  having 
jurisdiction. 

 

 

 

INSTALLATION INSTRUCTIONS 

Содержание SnowClear TK-C4000

Страница 1: ..._________________ Serial TK________________________ INSTALLATION OPERATOR MAINTENANCE MANUAL Table of Contents Important Instructions 2 Safety Instructions 2 Specifications 5 Installation Instructions...

Страница 2: ...Melter s warranty Please record the serial number on the front of the manual Having this number on hand is important when calling to order replacement parts Safety Instructions Follow Important Safety...

Страница 3: ...intenance SnowClear Overhead Melter must be properly installed by a licensed and qualified electrician before using Ensure they fully understand the procedure and are qualified to undertake any mainte...

Страница 4: ...inspections Risk of Fire High temperature risk of fire keep electrical cords drapery furnishings and other combustibles at least 0 9 m 3 feet from the front on the heater and away from the side and r...

Страница 5: ...ngle phase 208 240VAC 4000 W Heating Elements Four ceramic special coating halogen lamps Power Supply Connection Minimum 10 AWG 30 A 3 Conductor Cable Conductor cable is not supplied Continuous Run Ti...

Страница 6: ...ng element to cool before touching Do not touch the glass part of the heating element with bare hands as grease including fingerprints may cause the heating element to burn out prematurely Gloves shou...

Страница 7: ...SnowClear Installation Operator Maintenance Manual 7 Terminal Block and Wiring Guidelines Main Unit with Mounting Bracket M4 screw ring terminal...

Страница 8: ...erhead Melter is designed for domestic or commerical snow melting application in an outdoor area and should not be used or modified for any other purpose 8 Before starting installation check that the...

Страница 9: ...ng off a roof will not damage the product Step 1 Mount the bracket to the ceiling wall pole at the designated height see 11 under Installation Instructions Step 2 Install the unit to the bracket and s...

Страница 10: ...ght Install the unit 2 5m to 3m 8 2 to 10 feet above the ground Installation Angle Adjust the unit in the vertical inclination angle between 0 and 20 If the unit is to be installed on an incline ensur...

Страница 11: ...l screws are tight and that the unit is secure When installing the unit on a wood or thin wall or ceiling reinforcing the wall or ceiling with a steel plate is required to ensure that the weight of th...

Страница 12: ...r pole installation use the four holes indicated below Mount Unit to Bracket Wall Installation Use the two top holes on the main unit bracket to join the unit to the holding bracket 4 sets of M8 bolts...

Страница 13: ...iling Reinforce the attachment area with a steel plate to ensure that the unit s weight will be supported Ceiling Installation Angled For angled wall installation move the main unit upwards to 20 degr...

Страница 14: ...Angled For angled wall installation move the main unit upwards to 20 degrees Power Cable Wiring Guide Ensure the electrical cable dose not touch the unit Bend the electrical cable down to prevent wat...

Страница 15: ...trol plus a single 30 amp relay The DS 2C is recommended for one or more units Two or more units requires the DS 2C and one or more contactors Install the Danfoss Rain Snow Sensor Controller DS 2C acc...

Страница 16: ...SnowClear Installation Operator Maintenance Manual 16 One SnowClear Overhead Melter Unit Two SnowClear Overhead Melter Units...

Страница 17: ...SnowClear Installation Operator Maintenance Manual 17 Three to Six SnowClear Overhead Melter Units...

Страница 18: ...SnowClear Installation Operator Maintenance Manual 18 Seven to Twelve SnowClear Overhead Melter Units...

Страница 19: ...ctrical shock Installation and direct connection of the power contractor must be done by a licensed and qualified electrician Scope of Application per unit SnowClear is a far infrared overhead snow me...

Страница 20: ...eating Element Replacement Licensed and qualified electrician to perform this task a Disconnect the unit from the supply circuit b Unscrew the grill holders and remove the grill c Remove both side ref...

Страница 21: ...head melter under warranty will not extend the period of the warranty Any parts which are returned to Trecan Combustion Limited will become the property of Trecan Combustion Limited This limited warra...

Страница 22: ...ity or warranty of fitness for a particular purpose are limited to the duration of this warranty This limitation is not allowed by some States Provinces or Territories and so this limitation may not a...

Отзывы: