Trinox Floor Standing Shell and Tube Boiler
15 L344
©
Elco UK 04/07/2012
The burner draught tube must be sized as shown below:
Secure the burner to the door by means of the fixing plate so that the flame is parallel and centred
in the furnace; if not, combustion problems can occur with the risk of seriously damaging the boiler.
IMPORTANT: after installing the burner, fill any space between the draught tube and the hole of the
door with the material provided, resistant to 1000°C (ceramic fibre mat).
This operation prevents overheating of the door which would otherwise be permanent ly deformed.
If the burner is provided with an air intake, connect it by means of a rubber tube to the intake
located on the flame inspection window: in this way the glass will remain clear.
If the burner is not provided with air intake, remove the intake on the flame inspection window and
close the hole with a 1/8" BSP plug.
The fuel connections to the burner must be positioned in order to permit complete opening of the
boiler door with the burner fitted.
PRELIMINARY OPERATIONS PRIOR TO STARTING UP
Before starting up:
-
ensure that the regulation and control instrument probes are positioned correctly in their pockets;
-
check that the system is filled with water, de -aerated and at a correct pressure for the boiler;
(minimum 1.5 bar);
-
check that all the control and safety devices are in efficient working order and correctly set;
-
check that the furnace is free from foreign bodies;
CERAMIC FIBRE
Содержание Trinox 1000
Страница 7: ...Trinox Floor Standing Shell and Tube Boiler 7 L344 Elco UK 04 07 2012 TECHNICAL SPECIFICATION ...
Страница 11: ...Trinox Floor Standing Shell and Tube Boiler 11 L344 Elco UK 04 07 2012 Wiring Diagram for BMS relays ...
Страница 12: ...Trinox Floor Standing Shell and Tube Boiler 12 L344 Elco UK 04 07 2012 ...