Maintenance
Inspection overview
Pos. Nr.: Inspection check list - THISION L PLUS
on
ce
a
y
ea
r
Ac
tiv
ity
d
on
e
4.
00
0
hr
s.
*
At
le
as
t e
ve
ry
Remarks
√
Switch off power supply to the boiler and close the gas valve!
1
Air box/Boiler cover
1.0.1
Remove boiler cover
1.0.2
Check boiler cover/air box sealing on wear
1.0.3
Necessary cleaning
2
Gas pipes
2.0.1
Check all gas pipes on leaks
2.0.2
Check all gas fittings on leaks
2.0.3
Check all gas pipes and parts on corrosion and damage
2.0.4
Check static and dynamic gas pressure
3
Pressure parts
3.0.1
Check system pressure
(Plausibility check)
4
Checking parts on damage, corrosion, function and leaks:
4.0.1
Gas valve / Venturi
4 0 2
Automatic de-aerator
√
√
√
√
√
√
√
√
√
√
√
4.0.2
Automatic de-aerator
4.0.3
Hydraulic connections
4.0.4
Siphon dirt collector and condensate drain
4.0.5
Ignition and detection electrode
4.0.6
iConXL heat exchanger
4.0.7
manual deareator
5
Boiler/Burner in operation without air box/boiler cover:
5.0.1
Check flame
5.0.2
If flame is not stable - check adjustments and burner
5.0.3
Commissioning O
²
/CO
²
and Ionisation current
6.0.1
Check Air pressure switch proper funtioning
6.0.3
Check combustion air intake
6.0.4
Check gas flow
(Plausibility check)
6.0.5
Check O
²
/CO
²
6.0.6
In case of multiple units - All activities should be carried out on all units!
6.0.7
Reassemble boiler cover
7.0.3
Check desired temperature and actual flow temperature (Plausibi
√
√
√
√
6.0.2
Check all parts under over-pressure
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
7
Boiler/Burner in operation with air box/boiler cover:
7.0.1
Check function central heating
7.0.2
Check function DHW
7.0.4
Write down running hours from HMI and reset counter
6
Additional checks:
* To verify with local service depending by installing condition
Содержание TRIGON L PLUS
Страница 105: ...105 Notes...
Страница 106: ...106 Notes...
Страница 107: ...107 Notes...
Страница 108: ...108 Service www elco net ELCO GmbH Hohenzollernstra e 31 D 72379 Hechingen...