background image

Trispace AR Floor Standing Shell and TubeBoiler 

 

11                                                                           L360                                            

©

MHS Boilers 06/09/2013 

 

13  CLEANING  

  

Before cleaning operations make sure that:  
  
-  the main switch on the control panel has been turned off (OFF); 
  
-  the boiler isolation switch has been turned off.  
  
The user should only clean the outside casing of the boiler using a wet cloth with soap.  
  
If  the  dirt  is  particularly  difficult  to  remove,  soak  with  water  and  methylated spirit.  Do not use abrasive 
sponges or products and do not clean with jets of water.   
  

14  MAINTENANCE  

  

Periodic maintenance and measurement of the combustion efficiency are required and the person in charge of 
the heating system must ensure that these checks are carried out by professionally qualified personnel.  

  

15  PRODUCT RECEIPT  

  

The TRISPACE AR boilers are delivered as described below:  
  
1 x boiler body (inside the combustion chamber are the instrument panel box containing the documents, the 
       mineral wool for insulation of the boiler and the ceramic fibre mat for plugging the burner draught tube 
       void. 
  
1 x cardboard box containing the casing panels.  
  
The  boiler  must  be  handled  by  means  of  the  lifting  eyebolts  using  suitable equipment.   
  
In view of the weight of the boiler, you are advised not to attempt to move it manually. 

 

 

Содержание MHS Boilers Trispace AR 135

Страница 1: ...space AR Floor Standing Shell and Tube Boiler Operating Maintenance Manual MHS Boilers Ltd 3 Juniper West Fenton Way Basildon Essex SS15 6SJ Telephone 01268 546700 Fax 01268888270 WWW MHSBOILERS COM L...

Страница 2: ...INTENANCE 11 15 PRODUCT RECEIPT 11 16 INSTALLATION 13 17 INSTALLATION PREMISES 13 18 DISCHARGE OF COMBUSTION PRODUCTS 13 19 HYDRAULIC CONNECTION 13 20 ELECTRICAL SYSTEM 14 21 THE PROBLEM OF CONDENSATE...

Страница 3: ...ersonnel The term professionally qualified personnel means persons with specific technical skills in the sector of heating systems and components for domestic use and domestic hot water production To...

Страница 4: ...essionally qualified personnel The Trispace AR boiler is CE approved and applies to the following European standards 92 42 EEC Boiler efficiency directive 90 396 EEC Gas appliance directive 73 23 EEC...

Страница 5: ...593 2006 Code of Practice for treatment of water in domestic hot water central heating systems BS 7671 2008 Requirements for electrical installations IEE Wiring Regulations Seventeenth Edition BS EN 1...

Страница 6: ...o the boilers General description Technical specifications Requirements for design and installation Maintenance instructions The operating instructions for the user have been affixed to the appliance...

Страница 7: ...eat absorption is therefore obtained without noxious gas or thermal stresses and above all with over 93 increase in the working efficiency On leaving the dry pipes the products of combustion are colle...

Страница 8: ...1 Boiler body 8 Flue condensate discharge 2 Door 9 Technical specs and identification plate 3 Burner plate 10 Instrument board 4 Pilot flame r Return heating 5 Flue collector m Heating delivery 6 Flu...

Страница 9: ...1225 1890 2120 Maximum working pressure bar 5 6 Minimum return working temperature C 50 Maximum allowable temperature C 100 9 IDENTIFICATION ELEMENTS The appliance can be identified through the Data...

Страница 10: ...hermostat is active and set to 20 C that the system pumps are not blocked Turn on the master switch and then the main switch on the control panel The boiler will perform an ignition phase and once sta...

Страница 11: ...ic maintenance and measurement of the combustion efficiency are required and the person in charge of the heating system must ensure that these checks are carried out by professionally qualified person...

Страница 12: ...720 720 720 820 820 820 950 1000 mm L1 758 860 1010 1260 1260 1260 1510 1510 1612 1612 1812 2016 2266 mm L2 405 470 520 520 520 560 560 560 660 660 660 640 640 mm L3 388 330 440 690 690 690 940 940 9...

Страница 13: ...of rigid hermetically sealed pipes resistant to high temperatures condensation and mechanical stress For sealing the joints use materials that can withstand at least 250 C Badly sized and shaped flues...

Страница 14: ...e with the current safety regulations The manufacturer will not be liable for any damage caused by failure to earth the system Call professionally qualified personnel to check that the electrical syst...

Страница 15: ...nitoring check that the condensate forming in the flue does not also end up in the basin The condensation is acidic and corrosive and will therefore contaminate if discharged into the mains drainage s...

Страница 16: ...damaging the boiler IMPORTANT after installing the burner fill any space between the draught tube and the hole of the door with the material provided resistant to 1000 C ceramic fibre mat This operati...

Страница 17: ...p of the panel on the corner elements of the boiler structure Fit the right side panel s 2 taking the same precautions as with the left side To fit the rear casing proceed as follows position the bott...

Страница 18: ...owing the electric wiring diagram Appendix 1 page 28 Do not fix the electrical cables on the boiler body sheet metal panels on the door or on the flue collector Close the control board 26 PRELIMINARY...

Страница 19: ...ets on the water and combustion side they must be further tightened while hot in order to guarantee a perfect seal This operation is of fundamental importance for the gaskets of the door of the burner...

Страница 20: ...opening is normally from left to right To open the door remove the fixing nuts from the left Lifting equipment must be used to change the door opening direction Proceed as follows hook the door to th...

Страница 21: ...that the combustion circuit is perfectly sealed and replace any worn gaskets Check the system hydraulic seal to avoid unnecessary exchange of water and topping up which will increase the risk of scali...

Страница 22: ...ets easily covered with soot REMEDY check the burner regulation combustion check the fuel quality check the flue for clogging and the cleanness of the burner air intake dust FAULT smell of gas and or...

Страница 23: ...eck the efficiency of the expansion vessel check the calibration of the valve itself FAULT overheating due to lack of water in the boiler REMEDY Turn off the burner do not pour water and do not open t...

Страница 24: ...ness Park Basildon Essex SS15 6SJ Tel 01268 546700 Drawn by Date Title Version Drg Nr Pages Jim Wyborn 10 th September 2013 1 1 MHS 1 01 2 Trispace AR Wiring diagram 1 2 3 4 5 6 7 8 9 10 11 12 13 S3 B...

Страница 25: ...Date Title Version Drg Nr Pages Jim Wyborn 10 th September 2013 1 1 MHS 1 01 2 Trispace AR Wiring diagram with optional BMS relays 1 2 3 4 5 6 7 8 9 10 11 12 13 S3 B4 T T T L F IG TSAH TR1 TR2 TA IG...

Страница 26: ...Trispace AR Floor Standing Shell and TubeBoiler 26 L360 MHS Boilers 06 09 2013 34 NOTES...

Отзывы: