ELAR DW BRICK ™
©Elation Professional, Los Angeles Ca.
10
www.ElationLighting.com
6. MOUNTING AND INSTALLATION
Mounting points
Overhead mounting requires extensive experience, including amongst others calculating
working load limits, a fine knowledge of the installation material being used, and periodic
safety inspection of all installation material and the fixture. If you lack these qualifications, do
not attempt the installation yourself. Improper installation can result in bodily injury.
Be sure to complete all rigging and installation procedures before connecting the main
power cord to the appropriate wall outlet.
Mounting
The ELAR DW BRICK™ is fully operational in three different mounting positions, hanging
upside-down from a ceiling, side mounted, or set on a flat level surface. Be sure this fixture is
kept at least 0.5m away from any flammable materials (decoration etc.). When clamp
mounting; always use and install the supplied safety cable as an added safety measure to
prevent accidental damage in the event of a clamp failure. See the image below.
Содержание ELAR DW BRICK
Страница 31: ...ELAR DW BRICK Elation Professional Los Angeles Ca 30 www ElationLighting com 13 PHOTOMETRIC DATA...
Страница 32: ...ELAR DW BRICK Elation Professional Los Angeles Ca 31 www ElationLighting com 14 DIMENSIONAL DRAWINGS...
Страница 34: ...ELAR DW BRICK Elation Professional Los Angeles Ca 33 www ElationLighting com 16 CIRCUIT SCHEMATIC...