background image

All disclosures, notices and warranty conditions are being written on the EKWB website. Please read terms of use.                Revision 1.0. Released on September 18

th

 2012! 

STEP 3 (optional):  USING POLYETHER ANTI-VORTEX FOAM:

 

EK-RES X3 series reservoir comes preinstalled with EK-RES X3 – Anticyclone by default (long or short – depending on the variant). In case your system suffers 
from excessive vortex issues, air bleeding problems or if the pump is sucking in air you may replace the anticyclone with the enclosed polyether foam. There are 
two ways to use the polyether anti-vortex foam: 

Default configuration 

PE foam – use whole 

PE foam – trim to fit recess 

 

 

 

This is the default configuration of 
EK-RES X3 

series

 reservoir. 

Use the foam as a whole to replace EK-
RES X3 – Anticyclone. 

Trim the foam to size to fit into the 
desired recess on the Reservoir Bottom. 

 

STEP 4:  RECOMMENDED RESERVOIR CONFIGURATION 

 

EK-RES X3 series reservoir features 5 (five) G1/4 threaded inlet/outlet openings on the Reservoir Bottom plus additional one on the Reservoir Top.

 

In order for 

reservoir to function properly one port must be used as an inlet and one as an outlet. Unused ports must be closed with plugs using enclosed 6mm Allen key! 

 

GENERAL OVERVIEW OF ALL G1/4 THREADED PORTS:

 

 

 

 

 

 

 

IMPORTANT NOTES: 

1.

 

When using ports #3, #4 or #6 it is mandatory to use the enclosed 

EK-Extender G1/4 

(EAN: 3831109845165)

 due the ports being recessed into the plastic 

Reservoir Bottom. 

2.

 

When using EK-Extender G1/4 make sure not to use fittings or barbs with G1/4 thread longer than 5mm! All 

EK-PSC

 and 

High Flow

 fittings are 

compatible! 

3.

 

When using ports #1 and #2 make sure not to use fittings or barbs with diameter larger than 25mm! All 

EK-PSC

 and 

High Flow

 fittings are compatible! 

4.

 

EK recommends the use of EK-PSC fittings. When using fittings other than EK-PSC series please use hose clamps or appropriate substitute to secure the 

tubing to the barb. The use of biocide containing and corrosion inhibiting coolant is always recommended for any liquid cooling system. 

5.

 

Port #6 of EK-RES X3 series reservoir should only be used to connect this reservoir with external fill port! 

 

TIPS AND ADVICES: 

-

 

Using a horizontal pass-through configuration (using ports #1 and #5 as inlet/outlet) will yield in most optimal hydraulic conditions but may result in 

difficult initial bleeding of air in low restriction- or high pumping power water cooling systems. 

-

 

When using a bottom feeding vertical configuration (using ports #3 and #4 as inlet/outlet) you may experience severe vortex issues. Using a PE foam as 

a whole to replace the EK-RES X3 Anticyclone will remedy this issue. Please see STEP 3! 

-

 

Visit EK Webshop to purchase various add-ons (such as reservoir holders, tube extenders, alternative reservoir tops and many more) for your EK-RES X3 

series reservoir! 

 
REQUIRED TOOLS AND ACCESSORIES: 

 

 philips screwdriver      

power drill with 4mm drill bit (optional)

 

 

1

- Horizontal Port 

2

- Horizontal Port 

3

- Vertical Port 

4

- Vertical Port 

6

- Vertical Port (Top) 

5

- Horizontal Port (back) 

RECOMMENDED RESERVOIR CONFIGURATION: 

Allen Key 6mm 

EK-Plug G1/4 

EK-PSC fitting 

Tubing 

Отзывы: