- 15 -
STEP 5
Remove the protective sticker and position the CPU water block onto the
standoffs. Place the springs and thumb nuts over each standoff before
tightening them two revolutions at once, in a cross pattern. Do not tighten
them fully until all of them are partially screwed in.
STEP 5
THUMB NUT
COILED SPRING
STEP 6
Tighten the fitting barbs in a clockwise direction until the O-ring
underneath is compressed.
STEP 6
FITTING RING
FITTING BARB
INLET
PORT
OUTLET PORT