background image

This product is intended for installation only by expert users. 
Please consult with a qualified technician for installation. Improper 
installation may result in damage to your equipment. EK Water 
Blocks assumes no liability whatsoever, expressed or implied, 
for the use of these products, nor their installation. The following 
instructions are subject to change without notice. Please visit our 
web site at www.ekwb.com for updates. Before installation of this 
product please read important notice, disclosure and warranty 
conditions printed on the back of the box.

Before you start using this product please follow these basic guidelines:

Please carefully read the manual thoroughly before beginning 
with the installation process!

Please remove your motherboard from the computer to assure 
safest mounting process in order to prevent any possible 
damages to your CPU and/or motherboard’s circuit board (PCB).

The EK- Fittings require only a small amount of force to screw 
them firmly in place since the liquid seal is ensured by the 
rubber o-ring gaskets.

The use of quality, market proved corrosion inhibiting coolants 
is always strongly recommended for any liquid cooling system.

Содержание EK-Quantum Momentum VRM Bridge ROG Maximus XII Formula D-RGB - Plexi

Страница 1: ...USER GUIDE EK Quantum Momentum VRM Bridge ROG Maximus XII Formula D RGB Plexi...

Страница 2: ...notice disclosure and warranty conditions printed on the back of the box Before you start using this product please follow these basic guidelines Please carefully read the manual thoroughly before be...

Страница 3: ...ater block in the illustrated orientation and place the motherboard on a secure flat surface Using the enclosed 8mm Allen key install all four 4 fixation fittings to the pre installed VRM block and CP...

Страница 4: ...O Rings on the fixation fittings Next position the water block over the fixation fittings and force it into place evenly STEP 4 STEP 3 Slide the black acetal stand out with stainless steel fixation p...

Страница 5: ...position and screw back the M4 x 22 screw that was removed at Step 2 If the water block does not fit or the stand out will not return to its original position this could be due to the misalignment of...

Страница 6: ...your motherboard or controller The LED strip will only work if the pin layout on the header is as follows 5V Digital Empty Ground Incorrect installation or installation to the incorrect header could r...

Страница 7: ...r assistance please contact http support ekwb com EKWB d o o Pod lipami 18 1218 Komenda Slovenia EU EKWaterBlocks EKWaterBlocks ekwaterblocks ekwaterblocks EKWBofficial SUPPORT AND SERVICE SOCIAL MEDI...

Отзывы: