Released on 26
th
of February, 2014.
STEP 4: CONNECTING YOU RESERVOIR
You can use any G1/4 threaded ports marked as an outlet port except for the inlet port which is clearly marked (“IN”). We recommend using the 2
nd
outlet port right beneath the J-shaped plastic extrusion which eases the air bleeding process significantly. Make sure unused outlet ports are plugged
with enclosed plugs.
STEP 5: FILL THE RESERVOIR
Fill reservoir through G3/8 threaded fill port (marked with arrow) and make sure liquid is not spilled over your computer or any electrical devices nearby.
Preferably, your pump's height level should be lower than that of the EK-DBAY RES SPIN in order to flood and prime the water pump. Run your pump shortly for
couple of times to make sure water floods your tubes and other water cooling components. Repeat the procedure until you are done and pay attention to the
water level in your reservoir. Idealy there should be only so much water to make waterfall effect still noticable in the reservoir. Lowest and highest
recommendable water levels are indicated on the reservoir's front panel (
min
,
max
). Once done with filling please close your EK-DBAY RES SPIN with G3/8 plug
and tighten the seal using enclosed allen key.
STEP 5: OTHER INSTRUCTIONS
Please note that EKWB holds no responsibility of any kind if assembly is not performed as per instructions. This applies also for all
products that are not listed as compatible on web page. Users must by all means also consider instructions that are being made
for proper use of pump and other water cooling components/liquids provided by manufacturer(s).
HINT: Never let your pump running dry. Prolonged dry use enhances the risk of damaging the pump’s bearing thus rendering
pump useless.
Predrilled holes for
5mm LEDs (acrylic
version only)
EK G1/4 Plug
Outlet G1/4 threaded ports
Inlet G1/4
threaded port