background image

- 10 -

INSTALLATION OF FITTINGS AND TUBING

Screw in two male G1/4 threaded fittings. Attach the liquid cooling 
tubes and connect the water-block(s) into the cooling loop. 

EKWB 

recommends using EK-STC or EK-HTC fittings with the EK-
Vector series water blocks.

 TIf you are using barb fittings please 

add hose clamps or an appropriate substitute to ensure that the 
tubes are firmly secured.

You can configure any port as an inlet or outlet. Do not forget to plug 
all remaining ports with the enclosed EK-Plug G1/4 or equivalents.

CAUTION:

 If using fittings or plugs not recommending by EK take 

special care to check the length of the male G1/4 threads. 5 mm is 
the maximum allowed G1/4 thread length!

Tubing

EK-Fitting

EK-Plug G1/4

CONNECTING THE RGB LED STRIP (optional)

STEP 1

Plug the 4-pin connector from the water blocks RGB LED into the RGB 
HEADER on your motherboard. The LED will work correctly if the pin 
layout on the header is: 

+12V G R B

.

Please ensure that the arrow indicated on the connector is 
aligned with the +12V pin as indicated on your motherboard.

Failure to do so, will damage your motherboard or LED strip.

STEP 1

RGB Header

Содержание 3831109816172

Страница 1: ...INSTALLATION MANUAL EK Vector Radeon VII GPU WATER BLOCK...

Страница 2: ...on the back of the box Before you start using this product please follow these basic guidelines Please carefully read the manual before beginning with the installation process Please remove your graph...

Страница 3: ...LLATION OF SINGLE SLOT I O BRACKET OPTIONAL 7 INSTALLING THE WATER BLOCK 8 CHECKING FOR CONTACTS 9 INSERTING THE CARD IN YOUR PC CASE 9 INSTALLATION OF FITTINGS AND TUBING 10 CONNECTING THE RGB LED ST...

Страница 4: ...REMOVING THE STOCK COOLER Remove both encircled screws using a Phillips head screwdriver STEP 1 STEP 2 STEP 3 REMOVING THE STOCK COOLER CONTINUED Remove the remaining 15 screws as shown below The coo...

Страница 5: ...use of denatured alcohol for removing TIM leftovers Additionally remove all of the stock thermal pads from both sides of the PCB STEP 5 APPLYING THERMAL COMPOUND Lightly cover AMD GPU and HBM chips wi...

Страница 6: ...REMOVE THE PROTECTIVE STICKER FROM BOTH SIDES OF THE THERMAL PADS PRIOR TO INSTALLATION Replacement thermal pads 1 Thermal PAD F 1 0mm 120x16mm EAN 3830046996732 STEP 6 STEP 7 PLACING THERMAL PADS Onc...

Страница 7: ...crewdriver to remove all 6 screws which secure the I O bracket to the card Retain these screws for the next step and take the I O bracket off the PCB STEP 2 ATTACHING THE EK I O BRACKET Position the E...

Страница 8: ...y pressing the block down onto the PCB Chip dies are prone to cracking This procedure is the same for all Full Cover water blocks STEP 2 ATTACHING THE BLOCK TO THE GRAPHIC CARD Use a Phillips head scr...

Страница 9: ...tact please check again that your thermal pad thickness or contact our support service at http www ekwb com support INSERTING THE CARD IN YOUR PC CASE Carefully lift your graphics card with block inst...

Страница 10: ...maining ports with the enclosed EK Plug G1 4 or equivalents CAUTION If using fittings or plugs not recommending by EK take special care to check the length of the male G1 4 threads 5 mm is the maximum...

Страница 11: ...r assistance please contact http support ekwb com EKWB d o o Pod lipami 18 1218 Komenda Slovenia EU EKWaterBlocks EKWaterBlocks ekwaterblocks ekwaterblocks EKWBofficial SUPPORT AND SERVICE SOCIAL MEDI...

Отзывы: