background image

- 8 -

INSTALLING THE WATER BLOCK

STEP 1
PLACING THE BLOCK ON TO THE GRAPHICS CARD

Carefully position the water block with preinstalled standoffs onto 
the graphics card. During this process please make sure you align 
mounting holes on the PCB with holes on the water block. Also pay 
attention not to use too much force by pressing the block down onto 
the PCB. Chip dies are prone to cracking. This procedure is the same 
for all Full Cover water blocks.

STEP 2
ATTACHING THE BLOCK TO THE GRAPHIC CARD

Use a Phillips head screwdriver with the enclosed M2,5 x 4 AX1 
screws. EKWB recommends users to start tightening the screws 
evenly around the GPU core and then to continue outwards. Always 
use a plastic washer under every screw. 

STEP 1

STEP 2

In this step you will need:

Phillips-head 

screwdriver

M 2.5 x 4 AX1

17 pcs

M 2.5 PVC washer

17 pcs

Содержание 3831109816172

Страница 1: ...INSTALLATION MANUAL EK Vector Radeon VII GPU WATER BLOCK...

Страница 2: ...on the back of the box Before you start using this product please follow these basic guidelines Please carefully read the manual before beginning with the installation process Please remove your graph...

Страница 3: ...LLATION OF SINGLE SLOT I O BRACKET OPTIONAL 7 INSTALLING THE WATER BLOCK 8 CHECKING FOR CONTACTS 9 INSERTING THE CARD IN YOUR PC CASE 9 INSTALLATION OF FITTINGS AND TUBING 10 CONNECTING THE RGB LED ST...

Страница 4: ...REMOVING THE STOCK COOLER Remove both encircled screws using a Phillips head screwdriver STEP 1 STEP 2 STEP 3 REMOVING THE STOCK COOLER CONTINUED Remove the remaining 15 screws as shown below The coo...

Страница 5: ...use of denatured alcohol for removing TIM leftovers Additionally remove all of the stock thermal pads from both sides of the PCB STEP 5 APPLYING THERMAL COMPOUND Lightly cover AMD GPU and HBM chips wi...

Страница 6: ...REMOVE THE PROTECTIVE STICKER FROM BOTH SIDES OF THE THERMAL PADS PRIOR TO INSTALLATION Replacement thermal pads 1 Thermal PAD F 1 0mm 120x16mm EAN 3830046996732 STEP 6 STEP 7 PLACING THERMAL PADS Onc...

Страница 7: ...crewdriver to remove all 6 screws which secure the I O bracket to the card Retain these screws for the next step and take the I O bracket off the PCB STEP 2 ATTACHING THE EK I O BRACKET Position the E...

Страница 8: ...y pressing the block down onto the PCB Chip dies are prone to cracking This procedure is the same for all Full Cover water blocks STEP 2 ATTACHING THE BLOCK TO THE GRAPHIC CARD Use a Phillips head scr...

Страница 9: ...tact please check again that your thermal pad thickness or contact our support service at http www ekwb com support INSERTING THE CARD IN YOUR PC CASE Carefully lift your graphics card with block inst...

Страница 10: ...maining ports with the enclosed EK Plug G1 4 or equivalents CAUTION If using fittings or plugs not recommending by EK take special care to check the length of the male G1 4 threads 5 mm is the maximum...

Страница 11: ...r assistance please contact http support ekwb com EKWB d o o Pod lipami 18 1218 Komenda Slovenia EU EKWaterBlocks EKWaterBlocks ekwaterblocks ekwaterblocks EKWBofficial SUPPORT AND SERVICE SOCIAL MEDI...

Отзывы: