background image

MANUAL

IMS-CPU Setup Guide

IMS CPU-C15G2

24th September 2019

Meinberg Funkuhren GmbH & Co. KG

Summary of Contents for CPU-C15G2

Page 1: ...MANUAL IMS CPU Setup Guide IMS CPU C15G2 24th September 2019 Meinberg Funkuhren GmbH Co KG ...

Page 2: ...2 ...

Page 3: ......

Page 4: ...2 1 Additional Safety Hints 3 2 2 Supply Voltage 3 2 3 Cabling 4 3 Replacement or Installation of a Hot pluggable IMS Module 5 3 1 Important Hints for hot pluggable IMS Modules 6 4 Technical Specifications IMS CPU C15G2 7 4 1 Main Menu 9 Date 24th September 2019 IMS CPU Setup Guide ...

Page 5: ...unkuhren GmbH Co KG Lange Wand 9 31812 Bad Pyrmont Germany Phone 49 0 52 81 93 09 0 Fax 49 0 52 81 93 09 230 Internet https www meinbergglobal com Mail info meinberg de Date 2019 05 02 IMS CPU Setup Guide Date 24th September 2019 1 ...

Page 6: ...k to the manufacturer for maintenance Exchange of hot swap components Ensure that components which will be replaced during operation always be treated with the utmost care Avoid contact with live components Electrostatic discharge can damage electronic components For this reason ensure protection against electrostatic discharges by wearing anti static shoes while working with the system Take care ...

Page 7: ...on of high voltage devices 2 2 Supply Voltage WARNING This device is powered by a dangerous voltage Nonobservance of the safety instructions of this manual may lead to serious damage to persons and property and to danger to life Installtion commissioning maintenance and operation of this device are to be carried out by qualified personnel only The general safety instructions and standards e g IEC ...

Page 8: ...er work done the connectors particularly when connectors are opened may never be carried out when the installation is energized All connectors must be covered to prevent from accidental contact to life parts ALWAYS ENSURE A PROPER INSTALLATION 4 Date 24th September 2019 IMS CPU Setup Guide ...

Page 9: ...anchored in the connector block of the housing You need a certain amount of force to release the module from this link Once the connection to the connector block of the system s backplane is loosened the module can be easily pulled out 3 When installing the new IMS module please ensure that the board is correctly inserted into the two guide rails of the system housing Non observance can cause dama...

Page 10: ...u operate your system with only one power supply a second power supply must be installed before removing replacing it to keep your system functioning I O ESI and MRI Slots hot swappable CLK1 CLK2 hot swappable Afer the exchange or the installation of a clock module a rescan of the reference clocks Rescan Refclocks must be executed in the web interface menu System CPU not hot swappable The central ...

Page 11: ...rocessor E Series 2 Cores 1 33GHz TDP 3W Main Memory onboard 2 GB Cache Memory 1MB 2nd Level Cache Flash Disk 4 GB Network Connector 1 x 10 100 1000 Base T with RJ45 Jack 1 x 1000Base T with SFP Jack Serial Interface RJ45 connector console 38400 8N1 connection via CAB CONSOLE cable USB Port install firmware upgrades backup and restore configuration files copy security keys lock unlock front keys O...

Page 12: ...SI Layer 4 Transport Layer TCP UDP TIME RFC 868 DAYTIME RFC 867 SYSLOG OSI Layer 7 Application Layer HTTP HTTPS RC 2616 DHCP FTP NTPv3 NTPv4 SNTP RADIUS TACACS FTP SSH incl SFTP SCP SSH v1 3 SSH v1 5 SSH v2 OpenSSH SNMPv1 RFC 1157 SNMPv2c RFC 1901 1908 SNMP v3 RFC 3411 3418 Telnet RFC 854 RFC 861 Environmental Ambient Temperature 0 50 C 32 122 F Humidity Max 85 8 Date 24th September 2019 IMS CPU S...

Page 13: ...ce NTP Access Extended Statistics MRS external reference input signals Documentation Manuals support information The field in the lower section shows the last messages of the system with a timestamp added The newest messages are on top of the list This is the content of the file var log lantime_messages which is created after every start of the system and is lost after a power off or reboot By usi...

Page 14: ......

Reviews: