NP
F
11
F
P-DK50-10-A-1
Prio
and
Rem
and
Fig. 5: Rele
. PNEUNAT
11.1. Co
The pres
compress
compress
pneumati
equipmen
Fig. 6: Conn
Route the
compresso
11.2. Co
Connect th
dryers.
1_07-2019-MD
or to instal
d stabilizer
move fixing
d balanced
easing the p
TIC CONNE
nnecting to
ssure line
sed air
sor and co
ic hose or
nt.
nection to
pressure
ors in cabine
nnecting th
he condens
2
D
llation, ens
rs to avoid
g elements
d at the fina
pump
ECTION
o the comp
(2) is atta
outlet (1
onnect the
directly to
the compr
hose throu
et.
he conden
sate drain h
1
2
sure that th
any risk of
s of the pu
al installatio
pressed air
ached to th
1) on th
hose to th
the supplie
ressed air o
ugh the op
sate collec
hose to the
20
he compres
f damage t
umps once
on place.
r outlet
he
he
he
ed
outlet
ening in th
ction vesse
e condensat
ssor is free
to the prod
the compr
he back wa
el
te collection
e of all tran
uct.
ressor has
all of the c
n vessel on
INSTAL
nsport pac
s been asse
cabinet (Fig
n compress
LATION
07/2019
ckaging
embled
g. 7) on
sors with
Содержание DK50-10 S/M
Страница 1: ......
Страница 10: ...PRODU 07 2019 Fig 2 UCT DESRI DK50 10Z PTION Z M Comp pressor wit 13 th dryer NP DK50 10 A A 1_07 2019 MD...
Страница 11: ...NP F P DK50 10 A 1 Fig 3 Com 1_07 2019 MD mpressor D D K50 10S M 1 M 8 10bar 4 PROD DUCT DESR RIPTION 07 2019...
Страница 33: ...NP Fig 23 P DK50 10 A 1 g 15 30V 1_07 2019 MD D 3 36 PRODUC CT MAINTE ENANCE 07 2019...
Страница 48: ...PRODU 07 2019 Abb 2 UKTSCHRE 2 DK50 10 EIBUNG 0Z M Kom mpressor m 51 mit Trockne er NP DK50 10 A A 1_07 2019 MD...
Страница 71: ...NP Ab 23 P DK50 10 A 1 bb 15 30V 1_07 2019 MD D 7 74 PRO ODUKTWA ARTUNG 07 2019...