GuaRdboX
-
Gd
series
IOM
(
Installation, Operation & Maintenance Manual) 0100-ENG
rev.5
7
Eisenbau s.r.l. a socio unico
Via T.A:Edison, 16 20090 Cusago (MI) Italy
Phone : +390293562116 Fax: +390293567735
Guardbox production unit : Via XXIV Maggio, 13
25017 – Sedena di Lonato (BS)
Phone : +390309131240 Fax: +390309130946
www.eisenbau.it
www.guardbox-ex.com
Ms / MD
(magnetic
proximity
Spdt/DPDT)
Board assembly
Turn the actuator pinion full CW
and regulate the cam till the
switch (1) is activated
Turn the actuator pinion full CCW
and regulate the cam till the
switch (2) is activated
Pi / PN
(inductive
proximity) /
(inductive
proximity namur)
Board assembly
Turn the actuator pinion full CW
and regulate the cam till the
switch (1) is activated
Turn the actuator pinion full CCW
and regulate the cam till the
switch (2) is activated
Turn the actuator pinion full CW
and regulate the cam till the
switch (1) is activated
Turn the actuator pinion full CCW
and regulate the cam till the
switch (2) is activated
Turn the actuator pinion full CW
and regulate the cam till the
switch (1) is activated
Turn the actuator pinion full CCW
and regulate the cam till the
switch (4) is activated
Turn the actuator pinion full CW
and regulate the cam till the
switch (1) is activated
Turn the actuator pinion full CCW
and regulate the cam till the
switch (2) is activated