Installation and Connection of the UPS
MKD series
40
6.
Installation and Connection of the
UPS
All the requirements stated in the technical data for the surrounding and opera-
tional conditions are to be observed to ensure the perfect operation of the UPS.
In setting up / installing the UPS, the following must be heeded:
Avoid extreme temperatures and air moisture.
Consider the required horizontal installation position.
Make sure that the ventilation of the device is ensured. An appropriate flow
channel is to be considered.
Pay attention to the arrangement of the system. When installing in su-
perordinate systems (e.g. machines, control cabinets), make sure that the
UPS is operated in the indicated temperature range. When heat builds up
within the installation room, it must be removed with a sufficient ventilator.
It may only be attached on the flange (floor plate).
6.1
Connection of the UPS
The models of the MKD series are equipped with plug connections.
The UPS system includes components with high voltage and currents.
Improper handling can lead to electrical accidents with deadly conse-
quences or property damage.
The protective conductor must be connected! If this is not done, the
loads are not earthed.
The connection of the UPS must have the poles correct for generator
operation.
If the UPS system is in an emergency power off (EPO) circuit, it is to be con-
sidered that the UPS output will not be powerless if the EPO is activated.
The loads continue to be supplied for the length of the support period.