background image

 

This product has been manufactured under a quality management system certified to ISO 9001:2015 

 

Additional Legislation and Compliance Information 

EU RoHS Directive: Material Exemption Information

 

This product is compliant with the following Annex III Exemptions 

 

6(b) 

Lead

 as an alloying element in aluminium containing up to 0.4% by weight  

 

6(c) Copper alloy containing up to 4% 

lead

 by weight 

EU REACH Regulation Compliance 

This product is a complex article which is not designed for intentional substance release.  To the best of our knowledge 

the materials used comply with the requirements of REACH.  The product manual provides information and instruction to 

ensure the safe storage, use, maintenance and disposal of the product including any substance based requirements. 

Article 33.1 Declaration 

This product

 

does contain Candidate List Substances of Very High Concern above 0.1%ww by article as clarified under the 

2015 European Court of Justice ruling in case C-106/14. 

 

Lead (Pb)     

 

 

added to the Candidate List June 2018  

 

As indicated by the applied RoHS exemption(s) above this substance is present in certain aluminium and brass 

components.

  

 

A

DDITIONAL 

I

NFORMATION

 

The products listed are also in scope for and comply with the requirements of the following: 
2012/19/EU 

Directive on waste electrical and electronic equipment (WEEE)  

CSA-C22.2 No.77-2014 

Motors with inherent overheating protection 

CSA-C22.2 No.100-2014 

Motors and generators 

Product is certified to 

CSA-C22.2 No.61010-1-12 

Safety requirements for electrical equipment for measurement, control and 

laboratory use – Part 1: General requirements 

Product conforms to 

UL61010-1 3

rd

 Edition 

Safety requirements for electrical equipment for measurement, control and  

laboratory use – Part 1: General requirements 

 

材料成分声明

 

China Material Content Declaration 

 

 

  

有害物质

 

Hazardous Substances

 

部件名称

 

Part name

 

 

 

Lead 

(Pb)

 

 

Mercury 

(Hg)

 

 

Cadmium 

(Cd)

 

六价铬

 

Hexavalent 

Chromium 

(Cr VI)

 

多溴联苯

 

Polybrominated 

biphenyls 

(PBB)

 

多溴二苯醚

 

Polybrominated 

diphenyl ethers 

(PBDE)

 

铸铝及铝合金制品

 

Aluminium alloys

 

铜接头

 

Brass connectors

 

O:

 

表示该有害物质在该部件的所有均质材料中的含量低于

 

GB/T 26572

 

标准规定的限量要求

 

O: Indicates that the hazardous substance contained in all of the homogeneous materials for this part is below the limit 

requirement in GB/T 26572.

 

X:

 

表示该有害物质在该部件的至少一种均质材料中的含量超出

 

GB/T26572

 

标准规定的限量要求

 

X: Indicates that the hazardous substance contained in at least one of the homogeneous materials used for this part is 

above the limit requirement of GB/T26572.

 

 

Содержание A37104902

Страница 1: ...60Hz A37141919 E2M0 7 0 7 m3 h 1 100 120 V 50 60 Hz A37141902 E2M1 5 1 5 m3 h 1 200 230 V 50 60 Hz A37132919 E2M1 5 1 5 m3 h 1 200 230 V 50 60 Hz Interstage A37104919 E2M1 5 1 5 m3 h 1 100 120 V 50 6...

Страница 2: ...make any expressed or implied warranties regarding the content As far as practical we have ensured that the products have been designed and constructed to be safe and without risks when properly inst...

Страница 3: ...uum pumps Safety requirements Vacuum pumps EN 61010 1 2010 Safety requirements for electrical equipment for measurement control and laboratory use General requirements EN ISO 80079 36 2016 Explosive a...

Страница 4: ...this substance is present in certain aluminium and brass components ADDITIONAL INFORMATION The products listed are also in scope for and comply with the requirements of the following 2012 19 EU Direc...

Страница 5: ...allation 17 4 1 Safety 17 4 2 System design 17 4 3 Unpack and inspect 18 4 4 Locate the pump 18 4 5 Fill the pump with oil 19 4 6 Electrical installation 19 4 6 1 Connect the pump to the electrical su...

Страница 6: ...7 2 The pump fails to achieve specified performance failure to reach ultimate vacuum 32 7 3 The pump is noisy 32 7 4 The pump surface temperature is above 100 C 32 7 5 The vacuum is not maintained af...

Страница 7: ...10 2 11 Pump inlet or outlet NW25 adaptor 39 11 Service 40 11 1 Return the equipment or components for service 40 Page 5...

Страница 8: ...gures Figure 1 General view of the pump 11 Figure 2 Dimensions mm inches 14 Figure 3 Inlet filter removal and replacement 30 Figure 4 Gas ballast O ring removal and replacement 31 Figure 5 Accessories...

Страница 9: ...r nearest subsidiary Important safety information is highlighted as warning and caution instructions Obey these instructions WARNING If you do not obey a warning there is a risk of injury or death Dif...

Страница 10: ...azards from dangerous voltages Warning Hot surfaces Identifies a potential hazard from a hot surface Warning Use protective equipment Use appropriate protective equipment Warning Risk of explosion An...

Страница 11: ...hin the pump during normal operation but there may be potential sources of ignition under conditions of predictable and rare malfunction as defined in the Directive There is no potential source of ign...

Страница 12: ...tor will restart An oil pressure system lubricates the pump shaft bearing surfaces and rotor sealing faces The pump has an oil distribution valve which prevents discharge of oil to the pump interior s...

Страница 13: ...d see Locate the pump on page 18 4 NW10 inlet port adaptor flange 5 Gas ballast control 6 Oil filler plug 7 Outlet nozzle 8 Pump motor shaft rotation direction arrow 9 Oil sight glass and bezel 10 Pum...

Страница 14: ...re capacitance diaphragm gauge on a header as specified by Pneurop standards Table 2 Performance data Maximum displacement E2M0 7 E2M1 E2M1 5 50 Hz electrical supply 0 9 m3 h 1 1 0 ft3 min 1 1 8m3 h 1...

Страница 15: ...1 5 bar absolute 1 5 x 105 Pa 0 5 bar gauge 1 5 bar absolute 1 5 x 105 Pa 0 5 bar gauge 1 5 bar absolute 1 5 x 105 Pa 3 3 Mechanical data Table 3 Mechanical data Parameter Data Approximate pump mass...

Страница 16: ...rature is outside the range specified in Operating and storage conditions on page 12 or to optimise pump performance when processing condensible vapours a different oil may be required 3 5 Electrical...

Страница 17: ...Recommended cord sets and fuses for regional requirements Table 7 Recommended cord sets Description Rating Coupler type Item number Cord set assembly UK Cable style H05VV F 3 x 1 0 mm2 300 V 70 C max...

Страница 18: ...ype Item number Cord set assembly USA Canada 200 230 V Cable style SJT 3 x 14 AWG 300 V 90 C VW 1 maximum length of 3 0 metres Plug type NEMA 6 15P plug Appliance coupler IEC60320 style C14 N A Page 1...

Страница 19: ...afety see the Associated Publication at the end of the contents list at the front of this manual or contact us for advice A suitably trained and supervised technician must install the pump Obey the sa...

Страница 20: ...required 4 3 Unpack and inspect Remove all packing materials and protective covers and check the pump If the pump is damaged notify your supplier and the carrier in writing within three days state th...

Страница 21: ...pump 3 After a few minutes recheck the oil level If the oil level is now below the MAX mark pour more oil into the pump 4 Refit the oil filler plug Tighten the plug firmly by hand Do not overtighten...

Страница 22: ...readed hole Remove the NW10 flange and replace it with a NW25 flange adaptor available as an optional accessory see Spares and accessories on page 36 and then connect to the NW25 flange Take note of t...

Страница 23: ...er plastic hose to the outlet nozzle Figure General view of the pump on page 11 Remove the outlet nozzle and connect to the 3 8 inch BSP tapped hole Remove the outlet nozzle and replace it with an NW2...

Страница 24: ...h the pump is designed to pump flammable materials and mixtures operating procedures should ensure that under all normal and reasonably predictable conditions these materials and mixtures are not with...

Страница 25: ...For example if a mass flow controller is used to supply flammable gases to the process assume a flow rate for flammable gases that could arise if the mass flow controller is fully open Continually me...

Страница 26: ...e ultimate vacuum pump condensable vapours or decontaminate the pump oil refer to the procedures in To achieve ultimate vacuum on page 24 To pump condensable vapours on page 25 and To decontaminate th...

Страница 27: ...at step 2 below 2 Close the vacuum system isolation valve 3 Turn the gas ballast control fully anti clockwise 4 Operate the pump until the oil is clear 5 7 Unattended operation The pump is designed fo...

Страница 28: ...hutting down the pump this will prevent damage to the pump by the contaminates in the oil 1 Refer to To decontaminate the oil on page 25 and decontaminate the oil as required 2 Close the vacuum system...

Страница 29: ...ure that the pump is decontaminated before maintenance and that adequate precautions are taken to protect people from the effects of dangerous substances if contamination has occurred Do not touch or...

Страница 30: ...eplace the capacitor Every 4 years Replace the capacitor and test the motor on page 31 Test the motor condition Every 15000 hours of operation Replace the capacitor and test the motor on page 31 6 3 C...

Страница 31: ...the electrical supply and operate the pump for about 5 to 10 minutes Disconnect the pump from the electrical supply remove the oil drain plug and allow the oil to drain out of the pump Repeat this st...

Страница 32: ...hesive do not try to remove it Refer to Figure Gas ballast O ring removal and replacement on page 31 1 Unscrew and remove the gas ballast control 2 Remove the O ring from the control 3 Wash the O ring...

Страница 33: ...ed in the instructions supplied with the clean and overhaul kit see Spares and accessories on page 36 6 9 Fit new blades Fit new blades to the pump as described in the instructions supplied with the b...

Страница 34: ...The motor is faulty 7 2 The pump fails to achieve specified performance failure to reach ultimate vacuum The measuring technique or gauge is unsuitable There is a leak in the external vacuum system Th...

Страница 35: ...switched off The gas ballast control is open O ring s are damaged or missing The shaft seals have deteriorated 7 6 The pumping speed is poor The connecting pipelines are too small in diameter The conn...

Страница 36: ...2 Isolate the pump from the electrical supply 3 Purge your vacuum system and the pump with dry nitrogen and disconnect the pump from your vacuum system 4 Replace the oil as described in Replace the oi...

Страница 37: ...y in accordance with all local and national safety and environmental requirements Particular care must be taken with components and waste oil which have been contaminated with dangerous process substa...

Страница 38: ...nance kits also include instructions for the use of the kits Use the clean and overhaul kit for routine maintenance operations Use the blade kit together with the clean and overhaul kit when renewing...

Страница 39: ...st valve 8 Outlet mist filter 9 Flange adaptor kit 10 Vibration isolators 11 Oil drain extension 10 2 1 Inlet catchpot The inlet catchpot traps any liquid droplets and prevents their entry into the pu...

Страница 40: ...system Product Item number FL20K Foreline trap A13305000 10 2 7 Solenoid operated pipeline valve Fit the pipeline valve between the vacuum system and the pump inlet to provide additional system protec...

Страница 41: ...r Vibration isolators pack of four A24801407 10 2 11 Pump inlet or outlet NW25 adaptor This is a 3 8 inch BSP to NW25 adaptor supplied with connection hardware Use this adaptor when removing the NW10...

Страница 42: ...important for the safety of our employees and all other people involved in the service of your equipment The hazard information also lets us select the correct procedures to service your equipment We...

Страница 43: ...Page 41 A37132880_F Service...

Страница 44: ...edwardsvacuum com...

Отзывы: